Skip to main content

Ho Chi Minh City project bridge project

The local authorities in Ho Chi Minh City are setting plans for the US$229 million project to build the Thu Thiem 4 Bridge. This new link will connect District 2 and District 7 and the project is being handled by investors under a build-operate model. The deal includes arrangements over building plots in Thu Thiem New Urban Area's divisions No 3 and No 4. The bridge will measure 2.16km long and is intended to cut congestion in the city centre and on roads in Thu Duc and Binh Thanh districts to district 7,
October 13, 2017 Read time: 1 min

The local authorities in Ho Chi Minh City are setting plans for the US$229 million project to build the Thu Thiem 4 Bridge. This new link will connect District 2 and District 7 and the project is being handled by investors under a build-operate model. The deal includes arrangements over building plots in Thu Thiem New Urban Area's divisions No 3 and No 4. The bridge will measure 2.16km long and is intended to cut congestion in the city centre and on roads  in Thu Duc and Binh Thanh districts to district 7, 8, Nha Be and Binh Chanh.

Related Content

  • Elevated highway in Vietnam starting construction
    December 12, 2016
    Construction work on a new elevated highway route through Vietnamese conurbation Ho Chi Minh City is commencing. The project involves building a 30.4km stretch of highway, Elevated Road No5, through the busy metropolis and is expected to cost US$785.25 million. The new four lane road will run above National Highway 1A, with the work forming part of a wider project intended to help reduce Ho Chi Minh City’s chronic congestion problems. In all the city’s road transport department plans to construct five of th
  • New road works for Ho Chi Minh City
    June 1, 2021
    New road works are planned for Vietnam’s Ho Chi Minh City.
  • Vietnam bridge, road and highway development projects
    June 20, 2018
    Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
  • Highway proposals to extend Vietnam’s network
    November 12, 2015
    A series of major highway and road projects have been proposed for Vietnam. Investors have submitted a proposal to build North-South road costing an estimated US$383.8 million. Another proposal has come from the Project Management Board 85 to develop Bien Hoa-Tan Thanh-Cai Mep Seaport expressway, with an estimated cost of $591.5 million.