Skip to main content

Ho Chi Minh City project bridge project

The local authorities in Ho Chi Minh City are setting plans for the US$229 million project to build the Thu Thiem 4 Bridge. This new link will connect District 2 and District 7 and the project is being handled by investors under a build-operate model. The deal includes arrangements over building plots in Thu Thiem New Urban Area's divisions No 3 and No 4. The bridge will measure 2.16km long and is intended to cut congestion in the city centre and on roads in Thu Duc and Binh Thanh districts to district 7,
October 13, 2017 Read time: 1 min

The local authorities in Ho Chi Minh City are setting plans for the US$229 million project to build the Thu Thiem 4 Bridge. This new link will connect District 2 and District 7 and the project is being handled by investors under a build-operate model. The deal includes arrangements over building plots in Thu Thiem New Urban Area's divisions No 3 and No 4. The bridge will measure 2.16km long and is intended to cut congestion in the city centre and on roads  in Thu Duc and Binh Thanh districts to district 7, 8, Nha Be and Binh Chanh.

Related Content

  • Road tunnel for Hanoi's Hoàn Kiếm district
    July 7, 2022
    The project in the Vietnamese capital of Hanoi will have an investment of around US$4.3 million.
  • Vietnam’s US$5.5 billion ring road project
    September 16, 2024
    Vietnam is planning US$5.5 billion ring road project for HCMC.
  • Vietnam's mighty road budget
    February 7, 2012
    A massive budget for highway construction and upgrading is being set in place by the Vietnamese authorities. In all some US$18.73 billion is being set aside for the construction and development of Vietnam's expressway system.
  • Vietnam’s new beltway project
    October 12, 2018
    Work is progressing in Vietnam’s Ho Chi Minh City for construction of the new Beltway No3. An additional US$128.6 million is being set aside from the city’s budget to speed up work on the highway. The new beltway will measure 90km long, will allow vehicle speeds of up to 100km/h, with from two to four lanes in either direction. The route is being built in four sections. One stretch connects the Trung Luong expressway and National Highway No 22, another links National Highway No 22 and Binh Chuan, one joins