Skip to main content

Historic bridge damaged in flood opens in UK

The official reopening of a bridge badly damaged in the Cumbria floods has taken place. Bouthrey bridge, just off the A5084 between Water Yeat and Nibthwaite in South Lakeland, was severely damaged by the some of the heaviest rainfall ever recorded in England in November 2009. A temporary bridge was constructed as an interim measure and work began on repairing the main bridge.
April 25, 2012 Read time: 2 mins
The official reopening of a bridge badly damaged in the Cumbria floods has taken place. Bouthrey bridge, just off the A5084 between Water Yeat and Nibthwaite in South Lakeland, was severely damaged by the some of the heaviest rainfall ever recorded in England in November 2009. A temporary bridge was constructed as an interim measure and work began on repairing the main bridge. The work has been funded by 5432 Department for Transport capital funding which was put in place immediately following the floods in 2009. The type of repair was chosen after consultation. The work was contracted to 2958 Amey and a local contractor Ian Shaw, while 2762 Capita Symonds designed the bridge. The requirement to work within 2759 Environment Agency timeframes and additional environmental considerations had to be factored into the planning process, as the bridge is a Grade II listed structure. The Environment Agency worked closely with the council and contractors to manage flood risk throughout the construction of the new bridge, as well as protecting the local environment. In addition the Environment Agency is continuing to work with communities across Cumbria to look at ways to reduce the risk of flooding. Following the opening of Bouthrey bridge, Workington’s Northside bridge, where work is ongoing to provide a replacement bridge by May 2012, will be the only key road bridge in Cumbria that was either destroyed or damaged in the 2009 floods that is still to be replaced. In the immediate flood aftermath 20 road bridges were closed. Bouthrey bridge was opened by Cumbria County Council’s chairman, John Woolley.

For more information on companies in this article

Related Content

  • Riga's newest bridge improved traffic flow
    May 9, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List. The city of some 750,000 people (the country's total population is 2.2 million) is bounded to the south by Lithuania and to the north by Estonia, and is the second largest in Baltic States. To the east is Russia and Belarus.
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city
  • AmeySRM awarded UK's A533 bridge work
    July 14, 2020
    Under the €23 million contract work will start early 2021 for completion in summer 2022.