Skip to main content

Herrenknecht’s benefits from Indian orders

German company Herrenknecht says that in recent months it has received 18 orders from India for tunnel boring machines (TBMs) for projects to expand metro networks in the Indian cities of Delhi, Bangalore, Chennai and Kolkata, and for water supply schemes. Earlier this year an Indian record of 525m of drilled and secured tunnel was achieved in one month on the Veligonda water project (state of Andhra Pradesh) with a Herrenknecht Double Shield TBM (diameter 7.9m). The 18km Veligonda Tunnel is part of a sche
November 30, 2012 Read time: 2 mins

German company  Herrenknecht says that in recent months it has received 18 orders from India for tunnel boring machines (TBMs) for projects to expand metro networks in the Indian cities of Delhi, Bangalore, Chennai and Kolkata, and for water supply schemes.

Earlier this year an Indian record of 525m of drilled and secured tunnel was achieved in one month on the Veligonda water project (state of Andhra Pradesh) with a 2592 Herrenknecht Double Shield TBM (diameter 7.9m). The 18km Veligonda Tunnel is part of a scheme to pipe water from the Srisailam Dam on the River Krishna over a distance of about 100km. The tunnel, being built by the Nuziveedu Swathi Coastal Consortium, is being constructed using a Herrenknecht Double Shield TBM (Ø 7.9m).

“India is one of the world's largest economies, and there is a demand for metro systems, through which the high traffic volumes in the heavily built-up cities can be rerouted underground,” says Herrenknecht.

The EPB (earth pressure balance) shields (Ø 6.35m–6.6m) are being used to create a total of 71km of tunnels for mass transit systems.

In March 2012 the 1042 Italian-Thai Development Public Co began tunnelling with the first two of four Herrenknecht machines for the metro in Kolkata, while in Delhi two TBMs started work for Pratibha Industries. In July one of the TBMs completed its first intermediate breakthrough.

In Chennai, eight TBMs will excavate more than 38km of tunnels for new metro lines, while in Mumbai the existing water supply network is being renewed and expanded, and a total of three Herrenknecht TBMs (Ø 2.8m– 6.2m) drilled or are drilling over 16km of drinking water tunnels.

To mark the 60th Anniversary of the establishment of diplomatic relations between Germany and India, a Year of Germany in India is currently taking place, and during the Urban Mela series of events, Herrenknecht presented its portfolio covering all aspects of mechanised tunnelling in Chennai.

For more information on companies in this article

Related Content

  • Tunnelling technology award for Herrenknecht 
    October 26, 2022
    Herrenknecht has received the bauma Innovation Award 2022 in the Machine Technology category, for a new development in continuous tunnelling.
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • National Highway Authority of India (NHAI) rolls out new PPP regime
    January 11, 2016
    Financially delinquent contractors working on Indian projects will, from now on, find they are labelled a “non-performer” and barred from further work until they remedy their cash flow. The move by the National Highway Authority of India (NHAI) is an attempt to speed up site work and complete public-private partnership road projects on time. Under the new policies, firms that delay construction or fail to inject their share of capital into their projects will be barred from participating in fresh bids un