Skip to main content

Herrenknecht’s benefits from Indian orders

German company Herrenknecht says that in recent months it has received 18 orders from India for tunnel boring machines (TBMs) for projects to expand metro networks in the Indian cities of Delhi, Bangalore, Chennai and Kolkata, and for water supply schemes. Earlier this year an Indian record of 525m of drilled and secured tunnel was achieved in one month on the Veligonda water project (state of Andhra Pradesh) with a Herrenknecht Double Shield TBM (diameter 7.9m). The 18km Veligonda Tunnel is part of a sche
November 30, 2012 Read time: 2 mins

German company  Herrenknecht says that in recent months it has received 18 orders from India for tunnel boring machines (TBMs) for projects to expand metro networks in the Indian cities of Delhi, Bangalore, Chennai and Kolkata, and for water supply schemes.

Earlier this year an Indian record of 525m of drilled and secured tunnel was achieved in one month on the Veligonda water project (state of Andhra Pradesh) with a 2592 Herrenknecht Double Shield TBM (diameter 7.9m). The 18km Veligonda Tunnel is part of a scheme to pipe water from the Srisailam Dam on the River Krishna over a distance of about 100km. The tunnel, being built by the Nuziveedu Swathi Coastal Consortium, is being constructed using a Herrenknecht Double Shield TBM (Ø 7.9m).

“India is one of the world's largest economies, and there is a demand for metro systems, through which the high traffic volumes in the heavily built-up cities can be rerouted underground,” says Herrenknecht.

The EPB (earth pressure balance) shields (Ø 6.35m–6.6m) are being used to create a total of 71km of tunnels for mass transit systems.

In March 2012 the 1042 Italian-Thai Development Public Co began tunnelling with the first two of four Herrenknecht machines for the metro in Kolkata, while in Delhi two TBMs started work for Pratibha Industries. In July one of the TBMs completed its first intermediate breakthrough.

In Chennai, eight TBMs will excavate more than 38km of tunnels for new metro lines, while in Mumbai the existing water supply network is being renewed and expanded, and a total of three Herrenknecht TBMs (Ø 2.8m– 6.2m) drilled or are drilling over 16km of drinking water tunnels.

To mark the 60th Anniversary of the establishment of diplomatic relations between Germany and India, a Year of Germany in India is currently taking place, and during the Urban Mela series of events, Herrenknecht presented its portfolio covering all aspects of mechanised tunnelling in Chennai.

For more information on companies in this article

Related Content

  • Foundations for Mexico highway with help from Liebherr
    November 9, 2017
    A Liebherr rotary drill rig and oscillator combination has been working in Mexico on a highway project for contractor Mota-Engil. A Liebherr piling rig is playing an important role on a major Mexican highway construction project being carried out by a division of the Portuguese firm Mota-Engil. The use of the rig by Mota-Engil Mexico’s newly formed geotechnical division is helping to set new quality standards for piling in the country. The contractor is leasing one of the latest Liebherr LB 24-270 rotary
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • Work starting on second Chesapeake Tunnel project
    September 20, 2017
    Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil
  • New tunnelling technology saves time
    February 15, 2012
    New tunnelling technology from BASF has helped cut construction time on a major tunnel project in Australia. The system has been used to speed waterproofing, an important point as the link runs underneath one of Australia's major rivers. The spray-applied polymer membrane provided by a BASF sprayed concrete machine saved time and effort on the construction of the Clem Jones 7 Tunnel (Clem 7) in Brisbane, Australia. The 4.8km tunnel was completed seven months ahead of schedule and at its lowest point Clem 7