Skip to main content

Heavy going for heavy loads in Canada’s Alberta province

Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe. The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21. The journey took four days and the tower, a polypropylene-propane splitter - will be instal
January 9, 2019 Read time: 2 mins

Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe.

The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21.

The journey took four days and the tower, a polypropylene-propane splitter - will be installed at the Heartland petrochemical plant, one of many such facilities in Fort Saskatchewan.

Planning for the trip took the Edmonton officials more than a year and included guide vehicles and safety personnel accompanying the load. Care was taken to distribute the load over several trailers and multiple wheels. Any damage to road infrastructure is to be paid by the pipe owner, InterPipeline, noted newspaper reports.

This was the heaviest load to be transported on Alberta roads that are designated as part of the High Load Corridor, according to reports by local media.

It comes after a recent study by the provincial government that looked into upgrades to the 3,500km of the province’s High Load Corridor. Improvements would include bridge strengthening, road widening and the creation of staging and rest areas for overnight parking during a journey.

The Alberta government has defined the corridor as roads which have had their overhead utility lines raised to accommodate loads up to 9m high unless noted otherwise. Initial corridor construction was funded by the province’s department of transportation with the cost recovered from the users of the corridor in the form of permit fees.

Related Content

  • Interview with Jean Todt – FIA president
    January 19, 2018
    Reducing the death and injury toll on the world's roads is a key priority. It is estimated that every year, 1.25 million people die on the world’s roads. With motorisation and urbanisation to increase in many parts of the developing world in the years to come, there is every likelihood that this number could rise. Can you explain why so many lives are needlessly lost every year on our roads and why greater action isn’t being taken to address this?
  • Papua New Guinea mends its bridges
    February 28, 2022
    Under the latest tranche of the Sustainable Highlands Highway Investment Programme, 45 of the estimated 71 bridges will be completely replaced.
  • Ammann’s Chinese manufacturing facility
    November 7, 2018
    A group of Australian asphalt experts recently visited Ammann’s Chinese manufacturing facility during a recent information gathering tour. Twenty delegates from the Australian Asphalt Pavement Association (AAPA) visited South Korea, Japan and China and stopped at road authorities, a bitumen refinery, road construction firms, research institutes – and the Ammann China factory in Shanghai, which manufactures asphalt plants. According to reports, they were impressed with the quality of manufacturing at the fa
  • Roo'd Awakening and BMW Drivers
    June 29, 2018
    A rider amongst a group of cyclists on a training run in Australia had a rather unpleasant experience. The man was cycling along a road with his team mates when a young kangaroo jumped out from the road side and collided with him, knocking him from his bicycle. Although he was riding at speed at the time, he was not seriously hurt and as one of his team mates filmed the incident, will have video footage to better remember the incident by. The feelings of the kangaroo over the incident were not recorded.