Skip to main content

Heavy going for heavy loads in Canada’s Alberta province

Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe. The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21. The journey took four days and the tower, a polypropylene-propane splitter - will be instal
January 9, 2019 Read time: 2 mins

Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe.

The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21.

The journey took four days and the tower, a polypropylene-propane splitter - will be installed at the Heartland petrochemical plant, one of many such facilities in Fort Saskatchewan.

Planning for the trip took the Edmonton officials more than a year and included guide vehicles and safety personnel accompanying the load. Care was taken to distribute the load over several trailers and multiple wheels. Any damage to road infrastructure is to be paid by the pipe owner, InterPipeline, noted newspaper reports.

This was the heaviest load to be transported on Alberta roads that are designated as part of the High Load Corridor, according to reports by local media.

It comes after a recent study by the provincial government that looked into upgrades to the 3,500km of the province’s High Load Corridor. Improvements would include bridge strengthening, road widening and the creation of staging and rest areas for overnight parking during a journey.

The Alberta government has defined the corridor as roads which have had their overhead utility lines raised to accommodate loads up to 9m high unless noted otherwise. Initial corridor construction was funded by the province’s department of transportation with the cost recovered from the users of the corridor in the form of permit fees.

Related Content

  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • Russia’s most expensive road project to commence
    January 15, 2019
    Construction work is being planned for Russia’s most expensive road, which will be built in south of the country – Eugene Gerden reports Work is due to commence shortly on Russia’s most expensive road, in the south of the country. The highway will form part of the existing 1,600km Moscow-Sochi road, according to recent statements from senior officials at the Russian Ministry of Transport as well as local analysts. As part of the project, the Russian Government, together with private investors, plans to
  • LiDAR surveying is making inroads into asset management
    December 18, 2017
    In the coming age of the autonomous vehicle, fast and accurate LiDAR surveying will be increasingly important, explains Valdis Vanags. The game-changing introduction of autonomous vehicles relies not only on intelligent traffic systems but well maintained roads to help computer-guided systems navigate using road markings. Laser scanning technology, too, is a game changer when it comes to planning and executing many civil engineering projects, including transport network upgrades and smart city initiatives.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.