Skip to main content

Heavy going for heavy loads in Canada’s Alberta province

Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe. The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21. The journey took four days and the tower, a polypropylene-propane splitter - will be instal
January 9, 2019 Read time: 2 mins

Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe.

The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21.

The journey took four days and the tower, a polypropylene-propane splitter - will be installed at the Heartland petrochemical plant, one of many such facilities in Fort Saskatchewan.

Planning for the trip took the Edmonton officials more than a year and included guide vehicles and safety personnel accompanying the load. Care was taken to distribute the load over several trailers and multiple wheels. Any damage to road infrastructure is to be paid by the pipe owner, InterPipeline, noted newspaper reports.

This was the heaviest load to be transported on Alberta roads that are designated as part of the High Load Corridor, according to reports by local media.

It comes after a recent study by the provincial government that looked into upgrades to the 3,500km of the province’s High Load Corridor. Improvements would include bridge strengthening, road widening and the creation of staging and rest areas for overnight parking during a journey.

The Alberta government has defined the corridor as roads which have had their overhead utility lines raised to accommodate loads up to 9m high unless noted otherwise. Initial corridor construction was funded by the province’s department of transportation with the cost recovered from the users of the corridor in the form of permit fees.

Related Content

  • Carmacks wins Grande Prairie upgrade
    June 8, 2021
    Work will start soon to widen Highway 40 in and around the northern city of Grande Prairie in Canada's Alberta province.
  • Alberta to twin last 215km of Highway 3
    December 6, 2022
    Request for proposals are going ahead for twinning several more sections of Highway 3, a major commercial and trucking route that runs across the western Canadian province.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow