Skip to main content

Greek contractor Terna heading Qatar road project

Greek contractor Terna is heading a joint venture that will construct a major road project in the Middle East. The US$340 million road project is for the rebuilding of a 40km link in the Doha industrial area. The contract was awarded by Qatar's Public Works Authority (Ashghal). Terna is leading the joint venture, which also includes Gulf Consolidated Contractors and Wade Adams Contracting, will rebuild a 40-kilometre long road stretch in Doha industrial area. The work is expected to take three years to comp
September 16, 2015 Read time: 1 min
Greek contractor Terna is heading a joint venture that will construct a major road project in the Middle East. The US$340 million road project is for the rebuilding of a 40km link in the Doha industrial area. The contract was awarded by Qatar's Public Works Authority (Ashghal). Terna is leading the joint venture, which also includes Gulf Consolidated Contractors and Wade Adams Contracting, will rebuild a 40-kilometre long road stretch in Doha industrial area. The work is expected to take three years to complete and the deal includes maintenance of the route for 400 days after the construction work has been finished.

Related Content

  • Talks continue for 2025 Gordie Howe opening
    January 18, 2023
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.
  • Trevi Group posting strong results
    July 5, 2022
    Orders acquired by the Group in the first five months of 2022 amounted to €342.8 million.