Skip to main content

Go-ahead for new Forth Road Bridge

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.
March 1, 2012 Read time: 2 mins

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.

The Forth Crossing Bill, introduced in November 2009, was praised by MSPs for bringing forward proposals for a world-class, 21st Century crossing to replace the existing 2,512m long bridge with a main span of over 1,000m as the main route for traffic across the Forth estuary to and from the capital Edinburgh.

Due to the deterioration of the main suspension cables and other ongoing maintenance issues the existing bridge, opened in 1964, cannot continue as the main crossing for cross-Forth traffic and may have to close to some vehicles by 2017. Under the current proposals it would be retained as a dedicated public transport corridor for buses, cycles and taxis.

An impression of how the new Forth crossing (right) could look

By protecting the strategically vital transport link, the FRC will secure over 3,000 jobs and economic revenue of £1.3 billion (€1.5 billion). It will also deliver significant additional economic benefits through the creation of hundreds of jobs and sub-contracting opportunities for local companies, estimated by the British Chambers of Commerce to be worth around £6 billion (€7 billion) to Scotland’s economy.

With the approval by the Scottish Parliament, the crossing is on track and on target to be successfully completed in 2016.


It is expected that the principal contract to build the bridge and connecting roads, at an expected cost of £0.9 billion to £1.2 billion (€1 billion-plus to €1.4 billion), will be awarded in April, 2011 with the additional major contracts to upgrade the M9 Junction 1a and deliver ITS in the County of Fife awarded soon after.

The Forth road crossing will be the third major structural crossing of the lower Forth and will sit alongside the iconic Forth rail bridge and Forth Road Bridge from the 19th and 20th centuries.

Related Content

  • US infrastructure spending
    January 2, 2024
    US$492 billion in infrastructure funding remains to be allocated, but it all ends in 2026 by Mary Scott Nabers
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • New NY Bridge - Tappan Zee - main span towers poured
    December 16, 2016
    One of the largest US infrastructure projects is nearer completion after recent topping out of the eight main span towers of the New NY Bridge. The final concrete pour was in mid-December and all piles - more than 1,000 - have been installed in Hudson River. To date, 3,000 roadway panels for the approaches - making 5.5km in length - have been installed, according to the New York State Thruway Authority, owner of the New NY Bridge project. The New NY Bridge, also called the Tappan Zee Bridge, is on tra
  • River level monitoring to reduce scour risk
    July 11, 2022
    An OTT ecoLog 1000 water level logger with cellular data connection to Hydromet Cloud was trialled upon the Vales Burn Bridge in Scotland