Skip to main content

Go-ahead for new Forth Road Bridge

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.
March 1, 2012 Read time: 2 mins

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.

The Forth Crossing Bill, introduced in November 2009, was praised by MSPs for bringing forward proposals for a world-class, 21st Century crossing to replace the existing 2,512m long bridge with a main span of over 1,000m as the main route for traffic across the Forth estuary to and from the capital Edinburgh.

Due to the deterioration of the main suspension cables and other ongoing maintenance issues the existing bridge, opened in 1964, cannot continue as the main crossing for cross-Forth traffic and may have to close to some vehicles by 2017. Under the current proposals it would be retained as a dedicated public transport corridor for buses, cycles and taxis.

An impression of how the new Forth crossing (right) could look

By protecting the strategically vital transport link, the FRC will secure over 3,000 jobs and economic revenue of £1.3 billion (€1.5 billion). It will also deliver significant additional economic benefits through the creation of hundreds of jobs and sub-contracting opportunities for local companies, estimated by the British Chambers of Commerce to be worth around £6 billion (€7 billion) to Scotland’s economy.

With the approval by the Scottish Parliament, the crossing is on track and on target to be successfully completed in 2016.


It is expected that the principal contract to build the bridge and connecting roads, at an expected cost of £0.9 billion to £1.2 billion (€1 billion-plus to €1.4 billion), will be awarded in April, 2011 with the additional major contracts to upgrade the M9 Junction 1a and deliver ITS in the County of Fife awarded soon after.

The Forth road crossing will be the third major structural crossing of the lower Forth and will sit alongside the iconic Forth rail bridge and Forth Road Bridge from the 19th and 20th centuries.

Related Content

  • Wacker Neuson rebar tiers at Queensferry
    February 7, 2017
    When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor. Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK. Construction
  • Urgent repairs to Forth Rd bridge
    March 19, 2012
    Urgent repairs will continue on the Forth Road Bridge in east central Scotland this weekend after work the previous weekend was disrupted by strong winds. The bridge authority has also confirmed that a further three weekends of traffic restrictions will be required over the following weeks. On Saturday 17 and Sunday 18 March traffic will be restricted to a single lane in each direction from 3am until 12noon.
  • Importance of continued transportation investment
    May 2, 2012
    The US infrastructure network requires urgent attention - * T Peter Ruane. America's transportation infrastructure was once the "shining light on top of the hill." Major investments in a national highway, bridge, transit, airport, port and waterway system during the 20th century paid great dividends. The free and efficient flow of goods and people across the 50 states led to unparalleled economic expansion. The mobility and prosperity resulting from an interconnected infrastructure was a model for the world
  • Bridge savings in Scotland to fund road improvements
    August 27, 2014
    The project to construct the new Forth Crossing close to Scottish capital Edinburgh is looking extremely positive, with cost savings envisaged for the bridge. The Queensferry Crossing scheme now looks to require slightly less funding than had been originally expected when the plans were unveiled in 2011, due in part to tight controls over spending. The bridge costs had been budgeted at close to €2 billion (£1.6 billion) initially but the project now looks likely to cost €1.81 billion (£1.45 billion). The sa