Skip to main content

Go-ahead for new Forth Road Bridge

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.
March 1, 2012 Read time: 2 mins

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.

The Forth Crossing Bill, introduced in November 2009, was praised by MSPs for bringing forward proposals for a world-class, 21st Century crossing to replace the existing 2,512m long bridge with a main span of over 1,000m as the main route for traffic across the Forth estuary to and from the capital Edinburgh.

Due to the deterioration of the main suspension cables and other ongoing maintenance issues the existing bridge, opened in 1964, cannot continue as the main crossing for cross-Forth traffic and may have to close to some vehicles by 2017. Under the current proposals it would be retained as a dedicated public transport corridor for buses, cycles and taxis.

An impression of how the new Forth crossing (right) could look

By protecting the strategically vital transport link, the FRC will secure over 3,000 jobs and economic revenue of £1.3 billion (€1.5 billion). It will also deliver significant additional economic benefits through the creation of hundreds of jobs and sub-contracting opportunities for local companies, estimated by the British Chambers of Commerce to be worth around £6 billion (€7 billion) to Scotland’s economy.

With the approval by the Scottish Parliament, the crossing is on track and on target to be successfully completed in 2016.


It is expected that the principal contract to build the bridge and connecting roads, at an expected cost of £0.9 billion to £1.2 billion (€1 billion-plus to €1.4 billion), will be awarded in April, 2011 with the additional major contracts to upgrade the M9 Junction 1a and deliver ITS in the County of Fife awarded soon after.

The Forth road crossing will be the third major structural crossing of the lower Forth and will sit alongside the iconic Forth rail bridge and Forth Road Bridge from the 19th and 20th centuries.

Related Content

  • Innovative formwork beats bridge design challenges
    February 14, 2012
    Companies are coming up with innovative formwork solutions to overcome "challenging" designs for bridges. Patrick Smith reports
  • Concrete paving in Indiana
    April 2, 2021
    Important concrete paving work has been carried out in Indiana on key highway connections
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Securing safer transportation infrastructure through non-destructive technology
    June 16, 2014
    Kevin Vine reports on the use of non-destructive testing for structural analysis of bridges Seven years ago, the overpass collapse in Laval, Québec that led to the death of five people brought to light severe issues with the state of the country’s bridges and transportation infrastructure. More recently, a crack in the Champlain Bridge to Montreal that forced over 160,000 commuters to find alternate routes to work reaffirmed a need for greater emphasis on early detection before a crisis occurs.