Skip to main content

Go-ahead for new Forth Road Bridge

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.
March 1, 2012 Read time: 2 mins

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.

The Forth Crossing Bill, introduced in November 2009, was praised by MSPs for bringing forward proposals for a world-class, 21st Century crossing to replace the existing 2,512m long bridge with a main span of over 1,000m as the main route for traffic across the Forth estuary to and from the capital Edinburgh.

Due to the deterioration of the main suspension cables and other ongoing maintenance issues the existing bridge, opened in 1964, cannot continue as the main crossing for cross-Forth traffic and may have to close to some vehicles by 2017. Under the current proposals it would be retained as a dedicated public transport corridor for buses, cycles and taxis.

An impression of how the new Forth crossing (right) could look

By protecting the strategically vital transport link, the FRC will secure over 3,000 jobs and economic revenue of £1.3 billion (€1.5 billion). It will also deliver significant additional economic benefits through the creation of hundreds of jobs and sub-contracting opportunities for local companies, estimated by the British Chambers of Commerce to be worth around £6 billion (€7 billion) to Scotland’s economy.

With the approval by the Scottish Parliament, the crossing is on track and on target to be successfully completed in 2016.


It is expected that the principal contract to build the bridge and connecting roads, at an expected cost of £0.9 billion to £1.2 billion (€1 billion-plus to €1.4 billion), will be awarded in April, 2011 with the additional major contracts to upgrade the M9 Junction 1a and deliver ITS in the County of Fife awarded soon after.

The Forth road crossing will be the third major structural crossing of the lower Forth and will sit alongside the iconic Forth rail bridge and Forth Road Bridge from the 19th and 20th centuries.

Related Content

  • BMO Entreprenør wins Vestland bridges deal
    March 22, 2024
    The work, in western Norway, includes concrete rehabilitation, steel surface-treatment, removal and installation of bridge railings and moisture insulation.
  • UK smart motorway work for M4 link
    September 16, 2019
    Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane. The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five la
  • UK sets out transport investment plans
    December 5, 2013
    The UK Government has released its National Infrastructure Plan 2013 (NIP2013) at an event held in London at the Institution of Civil Engineers (CIHT). The National Infrastructure Plan 2013 sets out the UK Government’s vision and strategic objectives for infrastructure by assessing the needs, now and in the future, setting out a policy approach, identifying priority projects and providing a plan for delivery. The scheme will fund improvements to the A50 around Uttoxeter starting no later than 2015 to 2016,
  • European Transport Safety Commission makes call for traffic safety boost
    July 10, 2015
    In 2013, 7,600 people died in road traffic while cycling or walking in European Union (EU) countries – the equivalent of a commercial airliner full of passengers being lost every week Because of this risk of death, the European Transport Safety Council (ETSC) wants vehicle manufacturers and local authorities to pay special attention to improving safety for cyclists, walkers and pedestrians. In a new report, the ETSC said the numbers being killed are falling more slowly than those for vehicle occupants. Over