Skip to main content

Go-ahead for new Forth Road Bridge

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.
March 1, 2012 Read time: 2 mins

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.

The Forth Crossing Bill, introduced in November 2009, was praised by MSPs for bringing forward proposals for a world-class, 21st Century crossing to replace the existing 2,512m long bridge with a main span of over 1,000m as the main route for traffic across the Forth estuary to and from the capital Edinburgh.

Due to the deterioration of the main suspension cables and other ongoing maintenance issues the existing bridge, opened in 1964, cannot continue as the main crossing for cross-Forth traffic and may have to close to some vehicles by 2017. Under the current proposals it would be retained as a dedicated public transport corridor for buses, cycles and taxis.

An impression of how the new Forth crossing (right) could look

By protecting the strategically vital transport link, the FRC will secure over 3,000 jobs and economic revenue of £1.3 billion (€1.5 billion). It will also deliver significant additional economic benefits through the creation of hundreds of jobs and sub-contracting opportunities for local companies, estimated by the British Chambers of Commerce to be worth around £6 billion (€7 billion) to Scotland’s economy.

With the approval by the Scottish Parliament, the crossing is on track and on target to be successfully completed in 2016.


It is expected that the principal contract to build the bridge and connecting roads, at an expected cost of £0.9 billion to £1.2 billion (€1 billion-plus to €1.4 billion), will be awarded in April, 2011 with the additional major contracts to upgrade the M9 Junction 1a and deliver ITS in the County of Fife awarded soon after.

The Forth road crossing will be the third major structural crossing of the lower Forth and will sit alongside the iconic Forth rail bridge and Forth Road Bridge from the 19th and 20th centuries.

Related Content

  • Scotland’s Queensferry Crossing to open in summer 2017?
    May 31, 2017
    If good weather conditions continue then Scotland’s new Queensferry Crossing should open to traffic between July and August of this year. The bridge had originally been intended to be ready by December 2016 but construction work was delayed due to tough weather conditions.
  • Halcrow goes Forth with big Transport Scotland contract
    May 8, 2012
    Halcrow has been appointed by Transport Scotland to develop a bridge operating company contract to manage and maintain the new Forth Replacement Crossing and existing Forth Road Bridge. The £1.6million commission, won in the face of stiff competition under Transport Scotland’s multiple framework agreement, runs to December 2014.
  • Debating the future of the Forth bridge
    May 14, 2012
    A debate is now underway regarding the fate of the existing Forth Road Bridge in the Scottish capital Edinburgh. A new Forth Replacement Bridge is being planned at a cost of some €2.64 billion and once this opens, it will carry heavy vehicles, which will not be allowed over the current bridge. Excessive loading and corrosion have taken their toll on the current bridge, although measures to halt the cable corrosion in this suspension bridge have now been taken.
  • Harsco goes Forth
    June 25, 2012
    Harsco Infrastructure (HI) is providing bespoke scaffolding for a major refurbishment project being carried out on the famous Forth Road Bridge in Scotland. The £710,000 contract is seeing HI scaffolding used to allow work to be carried out to replace the large bearings which support each end of the structure, with no disruption to traffic using the bridge.