Skip to main content

Germany’s Schleswig-Holstein province starts €2.1bn 328 road renovation

The German province of Schleswig-Holstein has started the full €2.1 billion renovation of the 328 provincial road. Schleswig-Holstein has a special funding pot worth €38.5 billion which will be used for renovating the roads for which the province is financially responsible. The money will be spent between now and 2017.
May 21, 2014 Read time: 1 min
The German province of Schleswig-Holstein has started the full €2.1 billion renovation of the 328 provincial road. Schleswig-Holstein has a special funding pot worth €38.5 billion which will be used for renovating the roads for which the province is financially responsible. The money will be spent between now and 2017.

Related Content

  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • Liebherr extends rough terrain crane range
    April 9, 2018
    Unveiled at ConExpo 2017, Liebherr has extended its mobile crane product range with an additional series of rough terrain cranes in the 90tonne and 100tonne classes. The new rough-terrain crane LRT 1090-2.1 is said to feature high performance, safety and comfort. The VarioBase (variable support base) developed by Liebherr, which allows each individual outrigger beam to be extended to optional lengths, is standard on the LRT cranes. The crane model is powered by a Cummins diesel engine which develops 194kW
  • Fehmarn Belt tunnel work to start in January
    April 29, 2020
    Construction of the large-scale tunnel element factory at Rødbyhavn can now start soon.
  • Video captures nocturnal bridge demolition in Germany’s Ruhr area
    November 17, 2014
    It was a 24-hour job to demolish the bridge called On Leiterchen that crossed over the A43 in the industrial Ruhr area of the German state of North Rhine-Westphalia.

    Traffic was stopped in both directions between junctions Recklinghausen-Hochlarmark and Recklinghause-Herten.

    Before the serious work of nibbling away at the concrete structure could start, a 50cm layer of sand was spread across the entire motorway to protect the pavement from excavator machine tracks and falling concrete. The bridge eventually jack-knifed in on itself.