Skip to main content

Germany plans replacement for A40 Neuenkamp Duisburg Bridge

Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.
March 6, 2018 Read time: 2 mins
Germany’s longest cable stayed bridge, the proposed replacement A40 Neuenkamp Duisburg crossing (photo: Keipke Architekten)
Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg.


The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.

"We hope that there will be a planning approval decision in 2019. Only then can we start with the tenders,” said Karl-Heinz Aukschun, Deges project manager.

If so, construction could start in 2020 and the bridge open by 2023 after which the old bridge will be demolished. The entire project including highway expansion should be complete by 2026.

Estimated cost will be €340 million for the bridge alone, whose main span between the two piers will be 380m, making it Germany’s longest cable stayed bridge.

According to Deges, the bridge will carry 126,000 vehicles a day by 2030, although the bridge’s capacity will be 150,000 vehicles daily. Lifespan will be up to 100 years.

The existing 775m-long Neuenkamp Bridge was completed in 1971 and was designed to carry 30,000 vehicles daily. However, for several years it has been carrying around 110,000 vehicles a day, including 11,000 trucks, according to media reports.

The old bridge’s decks were resurfaced 10 years ago. But since then, the structure has been closed on occasions for emergency welding to repair cracks. At other times, weight restrictions have been put in place for trucks.

Questions have already been raised about land acquisition for the A40 highway expansion as well as over the steel to be used for the bridge. Critics have wanted to know if the steel will come from Germany or China.

Udo Pasderski, Deges area manager, said steel will be purchase that gives best value for the citizens. "We always have to accept the most cost-effective offer in Europe-wide tenders," he said.

However, construction of the A1 Rhine bridge near Leverkusen, which will probably begin in 2019, will use Chinese steel.

Related Content

  • Signify to light up Massey Tunnel
    January 15, 2021
    The LED replacements in the Vancouver area tunnel are Lumec TunnelView, made by Signify.
  • New Zealand busway project
    November 10, 2021
    Work is now going ahead for the busway project for Auckland in New Zealand.
  • Prague to replace the 90-year-old Liben Bridge
    May 8, 2018
    The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million. The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media. Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will
  • German Autobahn widening project near Duisburg
    May 3, 2016
    A major Autobahn widening project is planned in Germany for the busy A59 link near Duisburg. This Autobahn currently has four lanes but suffers heavy congestion at peak periods, with frequent delays and jams occurring. As a result, the stretch of the route will be widened to six lanes. The existing Berliner Bridge will also have to be demolished and rebuilt as it will be too narrow for the much wider Autobahn.