Skip to main content

German tunnel project agreement

A key agreement has been reached for a German tunnel project.
By MJ Woof March 19, 2020 Read time: 1 min
A new road/rail tunnel will connect the German island of Fehmarn with the mainland - image courtesy © of iigraphics, Dreamstime.com

A key agreement has been reached for a major tunnel project in Germany. The tunnel will connect Fehmarn Island with the mainland on Germany’s north coast. The agreement has been reached between the Ministry of Transport, the local government for Schleswig-Holstein, and DB Netz.

The island lies to the west of the port city of Kiel and the tunnel would connect with Holstein. The proposed link would be an immersed tunnel carrying both road and rail connections. It would feature dual rail tracks as well as two lanes for vehicle traffic in either direction. .Building the 1.7km tunnel is expected to cost €714 million and should the project go to plan, it should be completed by 2028.

Related Content

  • $270 million Tanzania bridge opens
    July 2, 2025
    A $270 million bridge has opened in Tanzania.
  • Sri Lanka's new highway - on track
    February 14, 2012
    Work is progressing on-track on Sri Lanka's Southern Expressway project. This will be the country's first expressway and is expected to be completed by 2012, removing the bulk of traffic from the existing coastal road that is highly congested and also has serious safety issues.
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b