Skip to main content

German minister oversees huge Herrenknecht TBM tunnel deal for Wuhan, China

German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.
April 28, 2014 Read time: 2 mins
German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two 2592 Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.

The German firm’s key contract with 5250 Shanghai Tunnel Engineering Co (STEC) was signed in Kunshan, Jiangsu Province on 23 April 2014 and will see Herrenknecht TBM’s play a vital role in extending Wuhan’s Metro network from three to seven lines, from 73km to 215km, by 2017. The megaproject in Wuhan, which has a population of 10 million, will enhance the city’s status as the most important transport hub in central China.

The two Mixshields with an excavation diameter of 15.76m being supplied to STEC by Herrenknecht will Cross under the Yangtze River in Wuhan and create a twin-bore double-decker tunnel. A three-lane road will run on the upper deck, with Metro line 7 below. The 2,590m long tunnel alignment runs up to 39.5m below the water surface in complex soil. On the one hand, a high water pressure of 5.3bar must be dealt with. In addition, the tunnel runs through varying geological formations, partly completely sand and clay, partly a mixed geology with mudstone, conglomerates and sand.

With its size and multi-purpose use, the Wuhan multi-functional tunnel construction is said to be a flagship project for mechanised tunnelling worldwide.

Shanghai Tunnel Engineering Co (STEC) has previously used Herrenknecht equipment on a number of other large-scale tunnelling projects in China, usually months ahead of schedule. These include several large-diameter road tunnels in Hangzhou and Shanghai.

For more information on companies in this article

Related Content

  • Herrenknecht delivers small diameter shaft drilling solution
    January 6, 2017
    Herrenknecht has developed a boxhole boring machine (BBM), based on its proven microtunnelling pipe jacking technology. The BBM1100 has been designed to drill slot holes and inclined shafts with a diameter of up to 1.1m and a maximum length of 30m. The machine uses a compact crawler base, with a modular jacking frame, cable drum and power pack that can be positioned separately if required.
  • Herrenknecht delivers small diameter shaft drilling solution
    April 14, 2013
    Herrenknecht has developed a boxhole boring machine (BBM), based on its proven microtunnelling pipe jacking technology. The BBM1100 has been designed to drill slot holes and inclined shafts with a diameter of up to 1.1m and a maximum length of 30m. The machine uses a compact crawler base, with a modular jacking frame, cable drum and power pack that can be positioned separately if required.
  • Beijing breakthrough for Jinghua
    January 11, 2023
    In September, the Beijing East Sixth Ring Road Reconstruction Project reported that mega slurry tunnel boring machine (TBM) called Jinghua had achieved its first breakthrough.
  • More studies for the Great Istanbul Tunnel under the Bosporus
    March 11, 2019
    Work has started on a geological condition field study for a proposed 6.5km three-deck road and rail tunnel under the Bosporus Strait in Istanbul, Turkey. Average daily road traffic through the Great Istanbul Tunnel is expected to be 120,000 vehicles and the rail line will move around 75,000 people daily. The tunnel, announced in 2015, will be nearly 19m in diameter and have two road levels and one rail level. It will run between Gayrettepe on the European side and Küçüksu on the Asian side. The ci