Skip to main content

German minister oversees huge Herrenknecht TBM tunnel deal for Wuhan, China

German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.
April 28, 2014 Read time: 2 mins
German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two 2592 Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.

The German firm’s key contract with 5250 Shanghai Tunnel Engineering Co (STEC) was signed in Kunshan, Jiangsu Province on 23 April 2014 and will see Herrenknecht TBM’s play a vital role in extending Wuhan’s Metro network from three to seven lines, from 73km to 215km, by 2017. The megaproject in Wuhan, which has a population of 10 million, will enhance the city’s status as the most important transport hub in central China.

The two Mixshields with an excavation diameter of 15.76m being supplied to STEC by Herrenknecht will Cross under the Yangtze River in Wuhan and create a twin-bore double-decker tunnel. A three-lane road will run on the upper deck, with Metro line 7 below. The 2,590m long tunnel alignment runs up to 39.5m below the water surface in complex soil. On the one hand, a high water pressure of 5.3bar must be dealt with. In addition, the tunnel runs through varying geological formations, partly completely sand and clay, partly a mixed geology with mudstone, conglomerates and sand.

With its size and multi-purpose use, the Wuhan multi-functional tunnel construction is said to be a flagship project for mechanised tunnelling worldwide.

Shanghai Tunnel Engineering Co (STEC) has previously used Herrenknecht equipment on a number of other large-scale tunnelling projects in China, usually months ahead of schedule. These include several large-diameter road tunnels in Hangzhou and Shanghai.

For more information on companies in this article

Related Content

  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul
  • Middle East financing for Moscow’s new toll route
    June 12, 2018
    Financing from the Middle East is helping to build the first toll road in Russia’s capital Moscow – Eugene Gerden reports. The first toll road within the Russian capital Moscow will be built this year with financing from a consortium comprising Russian and Arabian investors. This was revealed officially in a recent statement from the Moscow City Government. The heart of the project involves building a relief road for Kutuzovsky Prospekt, a major radial avenue in Moscow, which is known for its luxury stores
  • Teesing develops fast 700 bar hydrogen vehicle refuelling system
    April 13, 2015
    A Dutch maker of valves, couplings and flow regulators claims it has developed what it calls a “sustainable 700-bar filling technique” for hydrogen cars. The company, Teesing, says its PusH project successfully filled cylinders fast and efficiently with hydrogen at 700 bar. The system runs at 700 bar because hydrogen has a lower energy content than natural gas, which means that the same volume contains three times less energy. Refuelling hydrogen at a higher pressure, 700 bar, supplies enough energ
  • Chinese investors eye Brazilian work, including federal highway BR-153
    January 14, 2016
    Chinese investors are reported to be negotiating a contract to work on a section of federal highway BR-153 that goes from Anapolis in the Brazilian state of Goias to Palmas,n in Tocantins. The road is part of the Transbrasiliana Highway. The section was originally awarded to Brazilian construction firm Galvao Engenharia in September 2014, but the company never started expansion works.