Skip to main content

German minister oversees huge Herrenknecht TBM tunnel deal for Wuhan, China

German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.
April 28, 2014 Read time: 2 mins
German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two 2592 Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.

The German firm’s key contract with 5250 Shanghai Tunnel Engineering Co (STEC) was signed in Kunshan, Jiangsu Province on 23 April 2014 and will see Herrenknecht TBM’s play a vital role in extending Wuhan’s Metro network from three to seven lines, from 73km to 215km, by 2017. The megaproject in Wuhan, which has a population of 10 million, will enhance the city’s status as the most important transport hub in central China.

The two Mixshields with an excavation diameter of 15.76m being supplied to STEC by Herrenknecht will Cross under the Yangtze River in Wuhan and create a twin-bore double-decker tunnel. A three-lane road will run on the upper deck, with Metro line 7 below. The 2,590m long tunnel alignment runs up to 39.5m below the water surface in complex soil. On the one hand, a high water pressure of 5.3bar must be dealt with. In addition, the tunnel runs through varying geological formations, partly completely sand and clay, partly a mixed geology with mudstone, conglomerates and sand.

With its size and multi-purpose use, the Wuhan multi-functional tunnel construction is said to be a flagship project for mechanised tunnelling worldwide.

Shanghai Tunnel Engineering Co (STEC) has previously used Herrenknecht equipment on a number of other large-scale tunnelling projects in China, usually months ahead of schedule. These include several large-diameter road tunnels in Hangzhou and Shanghai.

For more information on companies in this article

Related Content

  • A road challenge for Zimbabwe
    November 8, 2023
    Construction work is finally underway for a major new highway link in Zimbabwe after many years of false starts.
  • MIRA builds on reputation for transport excellence
    October 3, 2012
    MIRA in central England has begun a huge redevelopment of its 830 acre site that will see the renowned centre for transport technologies expand its capabilities while, at the same time, create the largest transport research and development technology park in Europe. Guy Woodford reports This is all very impressive,” said Deputy Prime Minister Nick Clegg in April 2011 on hearing a presentation of MIRA’s ambitious expansion plans. As succinct appraisals go, Clegg’s view of MIRA’s plans to develop its brand of
  • Atlanta airport’s new apron
    October 12, 2012
    The new Maynard H Jackson Jr International Terminal at Hartsfield- Jackson Atlanta International Airport is now open for business. The 111,484m2 terminal features 12 gates, eight security checkpoints, separate levels for arrivals and departures, as well as a 148,831m2 concrete apron for aircraft to park on arrival. Archer Western won the contract to slipform the concrete apron, replace the existing Taxiway D, as well as other utilities and embankment work. The firm brought in one of its GOMACO paving trains
  • SDLG wheeled loaders assisting in Georgia’s concrete production
    March 13, 2015
    A fleet of wheeled loaders from SDLG is playing a key link in the chain for producing concrete at a facility in Georgia. With this equipment HeidelbergCement Georgia and HeidelbergBeton Georgia are proving able to keep pace with an intensive production schedule at a number of concrete production sites across Georgia. Overall HeidelbergCement Caucasus has seven concrete and two cement manufacturing plants in Georgia that are running SDLG wheeled loaders. The company’s SDLG fleet comprises LG936L, LG953 and L