Skip to main content

German minister oversees huge Herrenknecht TBM tunnel deal for Wuhan, China

German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.
April 28, 2014 Read time: 2 mins
German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two 2592 Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.

The German firm’s key contract with 5250 Shanghai Tunnel Engineering Co (STEC) was signed in Kunshan, Jiangsu Province on 23 April 2014 and will see Herrenknecht TBM’s play a vital role in extending Wuhan’s Metro network from three to seven lines, from 73km to 215km, by 2017. The megaproject in Wuhan, which has a population of 10 million, will enhance the city’s status as the most important transport hub in central China.

The two Mixshields with an excavation diameter of 15.76m being supplied to STEC by Herrenknecht will Cross under the Yangtze River in Wuhan and create a twin-bore double-decker tunnel. A three-lane road will run on the upper deck, with Metro line 7 below. The 2,590m long tunnel alignment runs up to 39.5m below the water surface in complex soil. On the one hand, a high water pressure of 5.3bar must be dealt with. In addition, the tunnel runs through varying geological formations, partly completely sand and clay, partly a mixed geology with mudstone, conglomerates and sand.

With its size and multi-purpose use, the Wuhan multi-functional tunnel construction is said to be a flagship project for mechanised tunnelling worldwide.

Shanghai Tunnel Engineering Co (STEC) has previously used Herrenknecht equipment on a number of other large-scale tunnelling projects in China, usually months ahead of schedule. These include several large-diameter road tunnels in Hangzhou and Shanghai.

For more information on companies in this article

Related Content

  • Topcon machine control units take the heat off an Alaskan contractor
    December 4, 2015
    Juniper, spruce, cranberry, cottonwood and rose. Most people think of pine trees and berries amid beautiful country fields. But for one contractor based just below the Arctic Circle in the US state of Alaska, the names represent a successful job completed using machine control. Valley General Construction recently finished a US$350,000 contract for the upgrading of country roads in the local borough of Matanuska-Susitna. The colourful names belong to roads in a heavily wooded residential subdivision located
  • Key Russian road construction complete
    December 5, 2016
    Construction work on the Central Section of Russia’s Western High-Speed Diameter (WHSD) in St Petersburg is complete, with some small detail work now being finished off. The WHSD connects the Southern, Central and Northern sections of St Petersburg and will open to traffic at the end of December. VTB Capital was a key participant in funding the construction of the Central Section and is a major shareholder in the consortium that will operate the entire WHSD route.
  • Kenya key road construction contract awarded
    March 28, 2017
    Contracts for a major highway project in Kenya have now been awarded. Two Chinese contractors will handle two sections of the new highway with the two portions of the project worth nearly US$175 million in all. The project involves improvements to the 206km road that runs through Isebania, Kissi and Ahero in Kenya to upgrade it to highway status. The project is of regional importance for East Africa as it will also connect with South Sudan and Tanzania and become part of a new road connection between the th
  • Costs rise for Berettyoujfalu-Nagykereki work
    June 8, 2021
    Hungary's deal with local companies A-Hid, Duna-Aszfalt and Hodut was signed in April 2017 for US$290 million.