Skip to main content

German highway tunnel project

The project to build the Riederwaldtunnel highway tunnel in Germany is now likely to cost €477 million. The project was originally expected to cost €322 million. The tunnel will stretch 1.1km and will provide a connection between the A66 and A661 routes. Construction work on the tunnel, located near the city of Frankfurt, is expected to commence in 2020.
February 7, 2019 Read time: 1 min

The project to build the Riederwaldtunnel highway tunnel in Germany is now likely to cost €477 million. The project was originally expected to cost €322 million. The tunnel will stretch 1.1km and will provide a connection between the A66 and A661 routes. Construction work on the tunnel, located near the city of Frankfurt, is expected to commence in 2020.

Related Content

  • Stonehenge tunnel going ahead?
    September 12, 2017
    The preferred route has been announced for a new road and tunnel link on the A303 route in the UK that will bypass the famous Stonehenge stone circle. The project now finally looks as if it might go ahead after years of debate, although several hurdles have yet to be passed. The work calls for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel. The new route will be located further away from Stonehenge and the tunnel is being built
  • PPP for Ecuador highway project
    May 11, 2018
    A 162km stretch of Ecuador’s highway route 40 is to be upgraded, improving the road’s safety and capacity. The section of highway being improved includes the stretch that links the town of Santa Elena, which lies on the Pacific Coast, with the city of Guayaquil, on the Guayas River. The contract now includes work to 30km more of the highway than was originally planned. The contractor Verdu is to carry out the PPP deal, which is expected to be worth US$231 million over the 20-year concession period.
  • Russian road project faces delay
    June 19, 2019
    Russia’s Sochi highway project will not now be completed by 2024. The original plan was to build a 119.km new route to replace the existing A147 route that connects Dzhubga with Sochi. Because of the challenging terrain, this project to build a new four lane highway without the twists and turns of the existing route would have been extremely costly, with a pricetag of as much as US$18 billion. However the project has now been downgraded as being of a lesser priority than other Russian road projects ongoing
  • Czech road project now underway
    October 12, 2018
    Construction work is underway on stretch of the D11 highway connecting Hradec Kralove and Smirice in the northern Czech Republic. The work is being carried out by a construction consortium comprising contractors Eurovia, Metrostav and Swietelsky. However, the start of the work for the 15.5km highway section was delayed and its completion is timed for 2022. The project is costing €100.5 million and includes a number of engineering challenges due to the complexity of the terrain. In all the work will include