Skip to main content

German highway tunnel project

The project to build the Riederwaldtunnel highway tunnel in Germany is now likely to cost €477 million. The project was originally expected to cost €322 million. The tunnel will stretch 1.1km and will provide a connection between the A66 and A661 routes. Construction work on the tunnel, located near the city of Frankfurt, is expected to commence in 2020.
February 7, 2019 Read time: 1 min

The project to build the Riederwaldtunnel highway tunnel in Germany is now likely to cost €477 million. The project was originally expected to cost €322 million. The tunnel will stretch 1.1km and will provide a connection between the A66 and A661 routes. Construction work on the tunnel, located near the city of Frankfurt, is expected to commence in 2020.

Related Content

  • Bolivia highway project awarded to Chinese firm
    June 8, 2018
    A Chinese contractor, Sinohydro, is now commencing a major highway project in Bolivia.
  • Successful talks for Chile-Argentina tunnel
    August 28, 2014
    Successful talks have been held between Chile and Argentina with regard to the Agua Negra Tunnel that will link the two countries. The project looks set to cost US$1.37 billion to construct, according to Business News Americas. The majority of the planned route, 72%, lies in Argentina and the country will provide the bulk of the funding required; some $986 million. Chile will provide the remaining $384 million. The agreement was struck between the Publics Works Ministries of the two countries. Further detai
  • US$12.85 billion for new Chinese highways
    September 17, 2024
    New Chinese highways worth US$12.85 billion are being planned.
  • Colombia road project tender process
    July 22, 2019
    The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km