Skip to main content

German highway tunnel project

The project to build the Riederwaldtunnel highway tunnel in Germany is now likely to cost €477 million. The project was originally expected to cost €322 million. The tunnel will stretch 1.1km and will provide a connection between the A66 and A661 routes. Construction work on the tunnel, located near the city of Frankfurt, is expected to commence in 2020.
February 7, 2019 Read time: 1 min

The project to build the Riederwaldtunnel highway tunnel in Germany is now likely to cost €477 million. The project was originally expected to cost €322 million. The tunnel will stretch 1.1km and will provide a connection between the A66 and A661 routes. Construction work on the tunnel, located near the city of Frankfurt, is expected to commence in 2020.

Related Content

  • Colombia’s Toyo Tunnel project in hand
    May 31, 2019
    Progress is being made for Colombia’s Toyo Tunnel project. Around 20% of the work has been carried out. Building the tunnel and the first stage of the connecting highway sections in Antioquia includes the construction of 17 bridges, seven tunnel sections and 4.4km of road. Tendering for the second stage of the project is due to start soon and will include building a further 19.4km of highway. The Toyo Tunnel project and the entire highway was originally expected to cost US$603.5 million but is now expected
  • €900 million German Autobahn project
    July 21, 2025
    Planning is underway for a €900 million German Autobahn project.
  • Gabon highway work starting
    July 27, 2020
    Work is starting on a new highway route for Gabon.
  • Colombian highway projects under development
    June 29, 2018
    A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km