Skip to main content

George Massey Tunnel Replacement gets environmental approval

The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.
February 13, 2017 Read time: 2 mins
The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver.

However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media.

Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.

The western Canadian project – called the George Massey Tunnel Replacement - still requires federal, provincial and local government permits before it can be given the green light for construction, expected to start this year for completion by 2022. An official name for the bridge has yet to be chosen.

Three consortia are vying for the project to which is intended to replace the existing George Massey Tunnel. One consortium is headed by Spanish company ACS and its local subsidiaries and also includes Star America Infrastructure Partners and Aecon. Another of the competing consortia is comprised of Kiewit, 2378 Macquarie and 5177 Vinci. The third consortium in the running for the project is made up of 6343 Fluor, 1378 John Laing and SNC-Lavalin.

The new bridge will be 547m above the water, allowing for the tallest of ships to pass, and have a separate lane for cyclists and pedestrians as well as high occupancy vehicle (HOV) lanes.

It will also be more than twice as long as the recently completed Port Mann Toll Bridge. A 3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 23103 0 oLinkInternal key project report in August 2015 Almost gone: Canada’s old Port Mann Bridge deconstructed false /sections/key-projects/features/almost-gone-canadas-old-port-mann-bridge-deconstructed/ false false%> featured the dismantling of the old bridge beside which the new bridge was built.

The bridge will be built directly above the George Massey Tunnel which was opened in 1959 but which suffers increasingly regular traffic congestion. Keeping it open as an alternate route or as a route for cycling and pedestrians was mooted but the cost of maintaining an ageing structure would be prohibitive. It will be closed and demolished after the new bridge is opened.

For more information on companies in this article

Related Content

  • Kuwait Fund loans Sri Lanka US$35m for bridge reconstruction
    December 11, 2014
    Kuwait Fund for Arab Economic Development has awarded a loan worth nearly US$35 million to the Sri Lankan government for reconstructing 25 deteriorated road bridges. The bridges include three in Southern Province, four in Sabaragamuwa Province, nine in Western Province, three in Northern Province, five in North Western Province and a bridge in Eastern Province. The loan comes after the Ministry of Highways, Ports and Shipping sent out an invitation to bid in October, covering eight bridges along the
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
  • Seoul, city of contemplation and the 25th World Road Congress
    March 18, 2015
    It’s been a decade since South Korea’s capital city Seoul took the bold step of replacing a major urban throughway with a park, complete with a river, to create the Cheonggyecheon Walkway. Now, Seoul is getting ready to host the 25th World Road Congress from November 2-5. The event is being produced in cooperation with the Ministry of Land, Infrastructure and Transport of the Republic of Korea, the Korea Expressway Corporation, the Korea Road & Transportation Association and the PIARC Korean National Commit