Skip to main content

Gabon highway work starting

Work is starting on a new highway route for Gabon.
By MJ Woof July 27, 2020 Read time: 1 min
Gabon’s major highway project is commencing shortly – image © courtesy of Rosevite2000, Dreamstime.com

Construction work will commence shortly on the new highway connecting Gabon’s capital, Libreville, with the city of Franceville. The project is expected to cost US$1.06 billion and the highway will stretch for a distance of 780km.

Work had been due to start in July 2020 but will now commence in September 2020 due to the Corona Virus pandemic.

Called the Transgabonaise Highway, the new road will take the place of stretches of the existing N1 and N3 routes, which are no longer considered suitable for current traffic volumes.

Related Content

  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Plans to extend highway 427 in Canada
    May 21, 2013
    Plans are in hand in Canada to extend Highway 427 by 6.6km. The final decision over the project has yet to be made by the Ontario Government. The work is expected to cost in the region of C$500 million (US$491 million) to carry out. The work is required as the highway carries a heavy traffic volume and the extension will help reduce congestion in the surrounding area. The work should commence in 2017 once the necessary approvals have been given and the construction would then require an estimated 36 months.
  • Fehmarnbelt Tunnel start looms on the horizon - 2020
    October 20, 2017
    Work on the €7 billion immersed tunnel under the Fehmarnbelt could begin in 2020, according to the Danish state planning and operating company Femern. A construction start has been delayed on the 18km tunnel that will run between Germany and Denmark because of environmental and consultation issues in Germany. But Claus Baunkjaer, chief executive of Femern, said he is confident that Germany will give approval next year with another two years of preparations. Baunkjaer noted that Denmark is all set to p