Skip to main content

Funds approved for Spain's tolled highway project

Funding for a road project in Spain is being set out by contractor Sacyr. The savings banks Caixanova and Unicaja will provide the funding, which will allow work to be completed on a 24.5km stretch of the AP-46 toll road linking Malaga and Alto de Las Pedrizas as to date only half of the work has been finished on the €367 million project. A further €200 million is required, with Sacyr providing the rest from its own sources.
May 15, 2012 Read time: 1 min
Funding for a road project in Spain is being set out by contractor 3959 Sacyr.

The savings banks Caixanova and Unicaja will provide the funding, which will allow work to be completed on a 24.5km stretch of the AP-46 toll road linking Malaga and Alto de Las Pedrizas as to date only half of the work has been finished on the €367 million project.

A further €200 million is required, with Sacyr providing the rest from its own sources.

The road was supposed to have opened in late 2009 but will not now be ready until 2011.

For more information on companies in this article

Related Content

  • Asphalt milling and paving with 3D control
    February 16, 2012
    Milling and paving repair operations for airport runways require particularly high tolerances, an obvious market for 3D control solutions writes Mike Woof. Airport runways require some of the most accurate quality standards and tightest tolerances of any asphalt or concrete surface. This is one area where the high precision capabilities of 3D systems offer clear advantages.
  • Texas highway construction project underway
    January 4, 2024
    A US$414 million Texas highway construction project is now underway.
  • £317 million UK highway project delayed
    February 12, 2025
    A £317 million UK highway project is delayed.
  • Funding secured for Nepal highway connection
    October 11, 2018
    A funding package has been secured that will help pay for a key road project in Nepal. The Asian Development Bank (ADB) is providing a loan worth US$180 million that will be used to help pay for widening work to an 87km stretch of the East-West Highway between Kamala and Kanchanpur. At present the route has just one lane in either direction but the upgrade will see the route being widened in a bid to boost capacity and safety, with two lanes in either direction. The project is being managed by the Nepalese