Skip to main content

France’s Chambon Tunnel on D1091 is final reconstruction phase

The reinforced Chambon Tunnel in the southeast French Alps region will open on schedule by the end of the year. The tunnel, which carries the D1091, was partially reopened at the end of last year following a landslide in 2015 along the mountain through with the bore is located. Local media report that from the end of this month, the tunnel will be closed again for the final phase of lining work. The road connects Bourg d’Oisans and the Col du Lautaret and Col du Galibier.
August 17, 2017 Read time: 2 mins
RSSThe reinforced Chambon Tunnel in the southeast French Alps region will open on schedule by the end of the year.


The tunnel, which carries the D1091, was partially reopened at the end of last year following a landslide in 2015 along the mountain through with the bore is located. Local media report that from the end of this month, the tunnel will be closed again for the final phase of lining work. The road connects Bourg d’Oisans and the Col du Lautaret and Col du Galibier.

The D1091 follows the edge of Chambon Reservoir which was built in 1935. The road previously ran in the valley but had to be relocated to the reservoir’s edge and was constructed at the same time as the reservoir.

To help accommodate traffic during tunnel closure, the central government paid around €24.4 million diversions including a 5.3km route secours - emergency road - along the opposite edge of the reservoir. However, the RS is for passenger vehicles and restricted to trucks of 3.5 tonnes.

Related Content

  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of
  • Mullum Mullum Valley untouched by progress
    July 20, 2012
    Preserving the unspoiled Mullum Mullum Valley was the major consideration when deciding to build a traffic tunnel The answer to one of the major issues facing construction of the A$2.5 billion EastLink route in Australia was simple: construct a tunnel. While it was expensive, those involved realised they had little option but to go underground to protect the environmentally sensitive Mullum Mullum Valley, an untouched area of wood and bushland in Melbourne. EastLink, the 39km toll road project on the easter
  • Innovative road/drainage tunnel plan for Jakarta
    February 16, 2015
    An innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The