Skip to main content

France road link to connect autoroutes

Work is commencing on a new road link that will connect the A89 and A6 Autoroutes in France’s Rhône Department. In addition, work is also underway on the construction of the new Semanet viaduct connecting Route Nationale 6 with Autoroute 6. The viaduct is being built with a steel deck sitting on concrete supports. The construction work is being managed by Autoroute operator APRR. Once the work is complete in 2018, it will help reduce journey times between Bordeaux and Geneva.
December 13, 2016 Read time: 1 min
Work is commencing on a new road link that will connect the A89 and A6 Autoroutes in France’s Rhône Department. In addition, work is also underway on the construction of the new Semanet viaduct connecting Route Nationale 6 with Autoroute 6. The viaduct is being built with a steel deck sitting on concrete supports. The construction work is being managed by Autoroute operator 6532 APRR. Once the work is complete in 2018, it will help reduce journey times between Bordeaux and Geneva.

For more information on companies in this article

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • Malaysian roads break ground
    January 27, 2025
    Work is underway for key Malaysian roads.
  • First stay cable installed on UK’s Mersey Gateway bridge
    October 31, 2016
    The first stay cable, 52m long, connecting the Mersey Gateway south pylon to the main bridge deck, has been installed on the Mersey Gateway Project.