Skip to main content

France-Italy tunnel in the spotlight for safety

An investigation is now being carried out into the safety of the new Col de Tende Road Tunnel project, currently being built.
June 27, 2017 Read time: 1 min

An investigation is now being carried out into the safety of the new Col de Tende Road Tunnel project, currently being built. Concerns have been raised about the strength of the concrete being used in the construction. A number of personnel from firms involved in the project have already been arrested on fraud and theft charges, with police actively investigating several high profile figures.

However an official statement has been released saying that there is no immediate danger with regard to the tunnel’s safety. Costing €280 million in all, the new Col de Tende Road Tunnel is due for completion in 2020. The link will be tolled, with a concession deal paying for the project.

The existing Tende tunnel was constructed in 1882 and is one of the oldest road tunnels in the world. However the 3.2km link can only handle traffic moving in a single direction, which leads to delays for users who often have to queue for up to 20 minutes at a red traffic light. Many drivers opt to take the Mont-Bland or Frejús tunnels instead as a result.

Related Content

  • Roads to Recovery after the pandemic
    January 11, 2021
    IRF president Bill Halkias shares the Federation’s view on post-Covid
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw