Skip to main content

Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal

A partnership including Fluor and ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan. The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new
July 6, 2018 Read time: 2 mins
Gordie Howe International Bridge: to be a Fluor and ACS Infrastructure Canada project
A partnership of 6343 Fluor and 917 ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project.


The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan.

The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 – aka the Herb Gray Parkway - in Ontario. Gray was a Windsor-born federal Canadian politician and deputy prime minister.

Fluor Canada and ACS Infrastructure Canada led the development phase of the project and will hold the prime contract.

Oher firms in Bridging North America include Dragados Canada, AECOM, brokerage services provider RBC Dominion Securities, Spanish engineering consultancy Carlos Fernandez Casado and FHECOR, architects Moriyama and Teshima and also architects Smith-Miller+Hawkinson.

The Gordie Howe Bridge will be the longest cable-stayed bridge in North America, according to the companies. Work will include building ports of entry on both the US and Canadian side of the river as well as improvements to existing infrastructure. Fluor and ACS will operate and maintain the facility for 30 years to standards set by WDBA.

This is the second project in the Windsor-Detroit area where Fluor and ACS have partnered. The two companies recently delivered and are operating and maintaining the Herb Gray Parkway that will connect directly to the new bridge that is named after a Canadian ice hockey player. Howe was with the Detroit team Red Wings in North America’s National Hockey League for many years, leading them to several victories.

Terence Easton, president of Fluor’s infrastructure business, called the appointment a “once-in-a-generation project” and said financial close will likely be later this year.

More information on the bridge is available on the WDBA %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external website false http://www.wdbridge.com/ false false%>.


For more information on companies in this article

Related Content

  • New conference plans for European road directors
    October 30, 2013
    Plans are in hand for the Conference of European Directors of Roads (CEDR). This event is now run every four years, with this next CEDR conference being the third to be held. The governing board for CEDR held a meeting in Helsinki and the Road Directors’ association reviewed the final report on the implementation of its previous strategic plan and the formalisation of its next. The CEDR strategic plan 3 (SP3) is to develop the priorities and targets for its next cycle. Each SP determines the structuring an
  • VIDEO: London’s Silvertown Tunnel gets approval
    October 13, 2016
    A road tunnel costing €1 billion and a €111 million cycle and pedestrian bridge are among three infrastructure projects given the go-ahead by London’s mayor.

    The Silvertown Tunnel and the cycle and pedestrian bridge will link the Canary Wharf area north of the River Thames with Rotherhithe on the south bank.

    London mayor Sadiq Khan also approved an extension to the Docklands Light Railway that would run to Gallions Reach on the south bank of the Thames.
  • 4x4 Canter is start turn on Mercedes Benz stand
    January 6, 2017
    A 4x4 version of Mitsubishi’s Canter light truck premiered at INTERMAT on the stand of its sister company Mercedes Benz, which distributes the vehicles in Europe. The 6.5tonne GVW vehicle is fitted with a transfer box that diverts half of the torque to the front wheels at the touch of a button and can be engaged while still on the move.
  • 4x4 Canter is start turn on Mercedes Benz stand
    April 19, 2012
    A 4x4 version of Mitsubishi’s Canter light truck premiered at INTERMAT on the stand of its sister company Mercedes Benz, which distributes the vehicles in Europe. The 6.5tonne GVW vehicle is fitted with a transfer box that diverts half of the torque to the front wheels at the touch of a button and can be engaged while still on the move.