Skip to main content

Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal

A partnership including Fluor and ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan. The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new
July 6, 2018 Read time: 2 mins
Gordie Howe International Bridge: to be a Fluor and ACS Infrastructure Canada project
A partnership of 6343 Fluor and 917 ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project.


The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan.

The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 – aka the Herb Gray Parkway - in Ontario. Gray was a Windsor-born federal Canadian politician and deputy prime minister.

Fluor Canada and ACS Infrastructure Canada led the development phase of the project and will hold the prime contract.

Oher firms in Bridging North America include Dragados Canada, AECOM, brokerage services provider RBC Dominion Securities, Spanish engineering consultancy Carlos Fernandez Casado and FHECOR, architects Moriyama and Teshima and also architects Smith-Miller+Hawkinson.

The Gordie Howe Bridge will be the longest cable-stayed bridge in North America, according to the companies. Work will include building ports of entry on both the US and Canadian side of the river as well as improvements to existing infrastructure. Fluor and ACS will operate and maintain the facility for 30 years to standards set by WDBA.

This is the second project in the Windsor-Detroit area where Fluor and ACS have partnered. The two companies recently delivered and are operating and maintaining the Herb Gray Parkway that will connect directly to the new bridge that is named after a Canadian ice hockey player. Howe was with the Detroit team Red Wings in North America’s National Hockey League for many years, leading them to several victories.

Terence Easton, president of Fluor’s infrastructure business, called the appointment a “once-in-a-generation project” and said financial close will likely be later this year.

More information on the bridge is available on the WDBA %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external website false http://www.wdbridge.com/ false false%>.


For more information on companies in this article

Related Content

  • First public outing for Liebherr tower crane at INTERMAT
    January 6, 2017
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.
  • First public outing for Liebherr tower crane at INTERMAT
    April 20, 2012
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.
  • Ethiopian Roads Authority (ERA) picks Spanish, Chinese contactors
    October 22, 2014
    The Ethiopian Roads Authority (ERA) has contracted out two major road projects to Spanish and Chinese companies. China Hunan Hunda Road & Bridge Construction will build the 111.3km Merkote-Delbo junction-Alaba-Sodo road under a contract worth around US$50 million (€39.12 million). Completion is within two and a half years. Spanish joint venture UTE Elsameks Eco Asphalt Ethiopia 35 will handle the 63km Ambo-Welliso project. Completion is due in three years, with funding of around $59 million from the W
  • Aceh Road Rehabilitation project wins key IRF GRAA award
    May 15, 2014
    The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries. Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated th