Skip to main content

Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal

A partnership including Fluor and ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan. The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new
July 6, 2018 Read time: 2 mins
Gordie Howe International Bridge: to be a Fluor and ACS Infrastructure Canada project
A partnership of 6343 Fluor and 917 ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project.


The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan.

The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 – aka the Herb Gray Parkway - in Ontario. Gray was a Windsor-born federal Canadian politician and deputy prime minister.

Fluor Canada and ACS Infrastructure Canada led the development phase of the project and will hold the prime contract.

Oher firms in Bridging North America include Dragados Canada, AECOM, brokerage services provider RBC Dominion Securities, Spanish engineering consultancy Carlos Fernandez Casado and FHECOR, architects Moriyama and Teshima and also architects Smith-Miller+Hawkinson.

The Gordie Howe Bridge will be the longest cable-stayed bridge in North America, according to the companies. Work will include building ports of entry on both the US and Canadian side of the river as well as improvements to existing infrastructure. Fluor and ACS will operate and maintain the facility for 30 years to standards set by WDBA.

This is the second project in the Windsor-Detroit area where Fluor and ACS have partnered. The two companies recently delivered and are operating and maintaining the Herb Gray Parkway that will connect directly to the new bridge that is named after a Canadian ice hockey player. Howe was with the Detroit team Red Wings in North America’s National Hockey League for many years, leading them to several victories.

Terence Easton, president of Fluor’s infrastructure business, called the appointment a “once-in-a-generation project” and said financial close will likely be later this year.

More information on the bridge is available on the WDBA %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external website false http://www.wdbridge.com/ false false%>.


For more information on companies in this article

Related Content

  • Bauma 2016 Innovation Awards entries accepted starting today
    April 1, 2015
    Entries are now open for the bauma Innovation Awards to be presented at the international construction and construction equipment trade fair bauma in Munich in 2016. As last time, in 2016 the awards are again being presented in five categories: • Machinery • Components • Construction process/Construction work • Research • Design bauma 2016 in Munich is a major international showcase for construction machinery, building material machines, mining machines, construction vehicles and c
  • Lintec’s new Aggregate Cooling System given bauma platform
    January 6, 2017
    Lintec’s Aggregate Cooling System (ACS) is described as a new, patented and fully containerised plant concept for the direct cooling of aggregates for concrete mixes. Being showcased at bauma, ACS is said by Lintec to work in a desert environment without the usual and costly addition of specifically produced ice.
  • First deck span completed for Mersey Gateway's north approach viaduct
    February 12, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.
  • Intermat launch for Liebherr wheeled excavators
    January 6, 2017
    2012 sees the start of a new wheeled excavator programme from Liebherr, and the A916 represents the first fruit from the project. Replacing the A316 Litronic, the new A916 has been developed to meet Stage IIIB emissions requirements and has an operating weight from 17-18.1 tonnes depending on specification. Power comes from a four-cylinder 110kW engine with common rail fuel injection, EGR and DOC – a DPF is available as an optional extra for those working inside buildings.