Skip to main content

Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal

A partnership including Fluor and ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan. The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new
July 6, 2018 Read time: 2 mins
Gordie Howe International Bridge: to be a Fluor and ACS Infrastructure Canada project
A partnership of 6343 Fluor and 917 ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project.


The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan.

The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 – aka the Herb Gray Parkway - in Ontario. Gray was a Windsor-born federal Canadian politician and deputy prime minister.

Fluor Canada and ACS Infrastructure Canada led the development phase of the project and will hold the prime contract.

Oher firms in Bridging North America include Dragados Canada, AECOM, brokerage services provider RBC Dominion Securities, Spanish engineering consultancy Carlos Fernandez Casado and FHECOR, architects Moriyama and Teshima and also architects Smith-Miller+Hawkinson.

The Gordie Howe Bridge will be the longest cable-stayed bridge in North America, according to the companies. Work will include building ports of entry on both the US and Canadian side of the river as well as improvements to existing infrastructure. Fluor and ACS will operate and maintain the facility for 30 years to standards set by WDBA.

This is the second project in the Windsor-Detroit area where Fluor and ACS have partnered. The two companies recently delivered and are operating and maintaining the Herb Gray Parkway that will connect directly to the new bridge that is named after a Canadian ice hockey player. Howe was with the Detroit team Red Wings in North America’s National Hockey League for many years, leading them to several victories.

Terence Easton, president of Fluor’s infrastructure business, called the appointment a “once-in-a-generation project” and said financial close will likely be later this year.

More information on the bridge is available on the WDBA %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external website false http://www.wdbridge.com/ false false%>.


For more information on companies in this article

Related Content

  • Five things road construction crews should not do
    June 19, 2015
    Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show. Here are five things that construction crews should not do.
  • Volvo CE’s earthmovers on film for promotion campaign
    October 25, 2018
    For its new publicity campaign, Volvo Construction Equipment has teamed up with film star hardman Dolph Lundgren to showcase its excavators’ endurance in a stunt-filled mini-movie entitled Pump It Up. In the tongue-in-cheek mini-movie Lundgren, whose credits include Rocky IV, Universal Soldier and The Expendables, plays an all-action drill instructor in an excavator boot camp determined to test the diggers to their limits. Excavators ranging from 1.5t to 95t are ordered to do press-ups, pull-ups, flip
  • Hillhead 2020 in the England will be even bigger than the 2018 event
    July 26, 2019
    On the back of a record-breaking event in 2018 the organisers of the UK’s Hillhead Exhibition have extended the event once again for 2020. The 2018 event was supported by 546 exhibitors and attracted an independently audited attendance of nearly 20,000. With outdoor space on track to be sold out by late autumn, an additional 2,200m² of stand space has been created in the quarry floor by extending the showground into the quarry face demonstration area. Hillhead 2020 takes place from 23–25 June, 202
  • World of Asphalt 2019
    December 12, 2018
    Tomorrow is your last chance to save 35% when you register for World of Asphalt 2019! Register now to attend the asphalt industry’s largest trade show and educational conference on February 12-14, 2019. Find solutions from 450 Exhibitors who will display their newest products and innovations. There’s no better place to train your team than World of Asphalt. With over 120 sessions to choose from, your whole team will leave with the right tools to grow.