Skip to main content

Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal

A partnership including Fluor and ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan. The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new
July 6, 2018 Read time: 2 mins
Gordie Howe International Bridge: to be a Fluor and ACS Infrastructure Canada project
A partnership of 6343 Fluor and 917 ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project.


The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan.

The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 – aka the Herb Gray Parkway - in Ontario. Gray was a Windsor-born federal Canadian politician and deputy prime minister.

Fluor Canada and ACS Infrastructure Canada led the development phase of the project and will hold the prime contract.

Oher firms in Bridging North America include Dragados Canada, AECOM, brokerage services provider RBC Dominion Securities, Spanish engineering consultancy Carlos Fernandez Casado and FHECOR, architects Moriyama and Teshima and also architects Smith-Miller+Hawkinson.

The Gordie Howe Bridge will be the longest cable-stayed bridge in North America, according to the companies. Work will include building ports of entry on both the US and Canadian side of the river as well as improvements to existing infrastructure. Fluor and ACS will operate and maintain the facility for 30 years to standards set by WDBA.

This is the second project in the Windsor-Detroit area where Fluor and ACS have partnered. The two companies recently delivered and are operating and maintaining the Herb Gray Parkway that will connect directly to the new bridge that is named after a Canadian ice hockey player. Howe was with the Detroit team Red Wings in North America’s National Hockey League for many years, leading them to several victories.

Terence Easton, president of Fluor’s infrastructure business, called the appointment a “once-in-a-generation project” and said financial close will likely be later this year.

More information on the bridge is available on the WDBA %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external website false http://www.wdbridge.com/ false false%>.


For more information on companies in this article

Related Content

  • Asphaltica exhibition and conference will provide asphalt road knowledge
    October 31, 2012
    The global economy is still suffering, and many believe investment in road and other infrastructure is the key to its revival Over the past 14 years in Italy, only 187km of new highways have been made, but, at the same time, the amount of vehicles using the country’s roads has grown by nearly 10 million. It is in this context of financial concern and growing burden on existing road infrastructure that the sixth edition of ASPHALTICA, the only European event exclusively dedicated to the world of asphalt, bit
  • The second ERF LAB event: 10 years down the road?
    October 24, 2019
    The second ERF LAB event* in Brussels examined the ‘Impact of new mobility on road infrastructure and equipment’, writes Christophe Nicodème, director-general of the ERF
  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack
  • Call for SME exhibitors at Road Infrastructure Innovation Expo, Brussels
    April 2, 2013
    SMEs developing innovative solutions to improve road infrastructure now have until 12 April, 2013, to apply to exhibit free-of-charge at the first Road Infrastructure Innovation Expo being held in Brussels, Belgium, 4-6 June 2013. Due to the involvement of additional countries and the final constitution of the scientific committee for the Infravation programme, organisers have extended the exhibitor registration deadline. All research fields are welcome addressing the theme of Advanced and Innovative Constr