Skip to main content

Florida’s I-4 project wins major award

Florida’s I-4 Ultimate highway project recently won a major award. The I-4 won the Best Transport Project award at the 2015 P3 Awards ceremony. Among entries, the US$2.3 billion highway project was recognised for its scale, complexity, and overall performance. Stretching through Orlando, the I-4 Ultimate project is a massive makeover of 33.6km of highway. It includes over a dozen reconstructed interchanges, 74 rebuilt bridges, 53 new bridges, and construction of four new express lanes. According to the P
December 15, 2015 Read time: 2 mins
A key Florida highway link has won a major transportation award - Image courtesy of the Florida Department of Transportation
Florida’s I-4 Ultimate highway project recently won a major award. The I-4 won the Best Transport Project award at the 2015 P3 Awards ceremony. Among entries, the US$2.3 billion highway project was recognised for its scale, complexity, and overall performance.

Stretching through Orlando, the I-4 Ultimate project is a massive makeover of 33.6km of highway. It includes over a dozen reconstructed interchanges, 74 rebuilt bridges, 53 new bridges, and construction of four new express lanes. According to the P3 Awards judges the project stood out from other applicants, “The project could be delivered 20 years sooner than if conventional procurement was considered.”

The award-winning project team consists of companies that design, build, finance, operate, and maintain the facility.  This includes a partnership between Florida DOT and I-4 Mobility Partners.

Within the I-4 Ultimate team are the pavement engineering specialists at The 5943 Transtec Group in Austin, Texas, who provided the pavement design. With the use of Transtec’s Alternative Technical Concepts (ATCs), contractors were able to accelerate the rate of pavement construction.

I-4 Ultimate includes a variety of other innovative benefits from Transtec’s pavement design such as better traffic flow, shorter travel times, increased safety, and the use of recycled and reused materials. This highway’s new efficiency will set a new standard for future Florida DOT highway projects, and potentially others across the Americas.

For more information on companies in this article

Related Content

  • Using technology so assess road surface quality
    April 4, 2014
    Advances in survey technology and the evolving face of road procurement are driving demand for highway condition data. Mark Thomas, infrastructure services manager at Fugro Aperio writes how surveys of new roads can improve long-term quality While a growing suite of non-intrusive testing, measurement and survey technologies are widely used to target highway repairs and to determine asset management strategies, the use of these powerful tools remains patchy in the early stages of the infrastructure life cycl
  • Australia responds to infrastructure funding challenge
    July 13, 2012
    The Global Financial Crisis (GFC) has drastically changed the way governments and the private sector is prepared to procure vital infrastructure projects, says Philip Davies Governments have responded to the GFC by focusing on long term investment in transport infrastructure and shorter term stimulus packages to kick-start economies. As these projects proceed, the focus will shift to maintaining and achieving maximum benefits from assets and future infrastructure funding. The Public Private Partnership (PP
  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Iowa expects longer lasting road surface
    June 9, 2015
    In the US state of Iowa, tough paving specifications are resulting in contractors delivering road surfaces that will last longer. The Iowa Department of Transportation (I-DOT) expects to see a highway road surface last 20 years and recently let the contract for a 25.7km road resurfacing project for Highway 92 between Winterset and Greenfield. The 40km link between the two towns sees an average 1,365 cars/day travel on the highway, which was last worked on in 1994 and its surface was due for replacement.