Skip to main content

Florida Turnpike improvements underway

A series of improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak
September 18, 2019 Read time: 2 mins
A series of  improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. 2697 Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak periods, improving journey times for drivers.


Elsewhere in the state, FDOT recently opened new lanes for the Beachline Expressway/SR 528 from I-4 to the Turnpike. This section now features two express lanes as well as an auxiliary lane in each direction. The improved section from the Turnpike to McCoy Road is also scheduled to open shortly. The work includes intersection improvements and is costing $170 million, while it is intended to boost capacity and safety, as well as cutting congestion and journey times for drivers.

FDOT is also evaluating the potential for road improvements between US 17/SR 35 and SR 60 in Polk County.

In addition, Florida’s Turnpike Enterprise recently began collecting all-electronic, no cash tolls at the southbound Sawgrass Expressway entrance ramp from Pat Salerno Drive. Tolls are now being collected using an overhead toll gantry system.

For more information on companies in this article

Related Content

  • Major US interchange project underway
    February 14, 2012
    Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven.
  • UK’s A14 upgraded route opening early
    October 14, 2019
    A key section of the UK’s important A14 upgrade project is opening to traffic ahead of schedule. Work to deliver the new stretch of dual carriageway for the A14 bypass is being completed a full 12 months early. The bypass section will open to drivers in December 2019, cutting congestion and journey times. Work on the 19km bypass section commenced in October 2016 and forms part of a programme of 33.6km of road works in Cambridgeshire, costing £1.5 billion. The road building project has been carried out by
  • Revamp for Russian route connecting to Crimea crossing
    October 19, 2018
    A major road revamp project is being planned in Russia. The approach routes to the new bridge connecting with Crimea will be improved, boosting capacity, safety and traffic flow. The project will run as part of a series of transport upgrades in the Krasnodar Region, running until 2024 and worth a total of US$1.3 billion. A 136km stretch of the 150km stretch of highway between Krasnodar and Temryuk will be improved, in a bid to meet the anticipated jump in traffic from around 10,000-20,000 vehicles/day at
  • Kenya moves ahead with double-decker road to address costly city traffic jams
    December 11, 2013
    New double deck roads could cut congestion in Kenyan capital Nairobi – Shem Oirere reports Arapid increase in urban population and diminishing land for infrastructure expansion has forced Kenya to devise ways of addressing the worsening human and vehicular traffic problems in its capital Nairobi. The country national highways agency recently announced progress in the planned construction of the country’s first double-decker highway.