Skip to main content

Florida Turnpike improvements underway

A series of improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak
September 18, 2019 Read time: 2 mins
A series of  improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. 2697 Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak periods, improving journey times for drivers.


Elsewhere in the state, FDOT recently opened new lanes for the Beachline Expressway/SR 528 from I-4 to the Turnpike. This section now features two express lanes as well as an auxiliary lane in each direction. The improved section from the Turnpike to McCoy Road is also scheduled to open shortly. The work includes intersection improvements and is costing $170 million, while it is intended to boost capacity and safety, as well as cutting congestion and journey times for drivers.

FDOT is also evaluating the potential for road improvements between US 17/SR 35 and SR 60 in Polk County.

In addition, Florida’s Turnpike Enterprise recently began collecting all-electronic, no cash tolls at the southbound Sawgrass Expressway entrance ramp from Pat Salerno Drive. Tolls are now being collected using an overhead toll gantry system.

For more information on companies in this article

Related Content

  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.
  • Washington DC route widening underway
    June 14, 2022
    Widening work is underway for the Washington DC beltway route.
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Bertha readies for more Seattle SR99 Alaskan Way Viaduct tunnel work
    July 27, 2015
    Bertha, one of the world’s largest tunnelling machines will resume work underneath the US city of Seattle in November, nearly two years after breaking down. Bertha, at 17.4m diameter, began her journey in July 2013. She was boring a path to relocate a 3.2km stretch of the elevated State Route 99 Alaskan Way Viaduct, built between 1949 and 1953 and which carries around 100,000 vehicles daily. The elevated section will be moved underground allowing the creation of public space along Seattle’s downtown w