Skip to main content

Florida Turnpike improvements underway

A series of improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak
September 18, 2019 Read time: 2 mins
A series of  improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. 2697 Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak periods, improving journey times for drivers.


Elsewhere in the state, FDOT recently opened new lanes for the Beachline Expressway/SR 528 from I-4 to the Turnpike. This section now features two express lanes as well as an auxiliary lane in each direction. The improved section from the Turnpike to McCoy Road is also scheduled to open shortly. The work includes intersection improvements and is costing $170 million, while it is intended to boost capacity and safety, as well as cutting congestion and journey times for drivers.

FDOT is also evaluating the potential for road improvements between US 17/SR 35 and SR 60 in Polk County.

In addition, Florida’s Turnpike Enterprise recently began collecting all-electronic, no cash tolls at the southbound Sawgrass Expressway entrance ramp from Pat Salerno Drive. Tolls are now being collected using an overhead toll gantry system.

For more information on companies in this article

Related Content

  • Major road improvements for Western Australia
    April 17, 2019
    A series of major road improvement projects are to be carried out on key routes in Western Australia. In all US$1.07 billion (A$1.52 billion) is being budgeted for the work to eight important road sections in the state. The Tonking Highway will benefit from improvements to three sections. These include a widening project, a new link to connect with Mundijong, two new interchanges and a flyover. Meanwhile the Roe Highway will benefit from upgrades to two road sections., including new interchanges. Improvemen
  • UK M6 motorway project complete
    December 20, 2024
    Work for the UK’s M6 motorway upgrade project is complete.
  • Daktonics' Vanguard dynamic message sign products get approved by Florida DoT
    March 20, 2012
    Two full-colour, high-resolution Daktronics Vanguard dynamic message sign (DMS) products have officially been approved by the Florida Department of Transportation (FDoT) to manage traffic congestion and provide safety on highways throughout the state. By adding these two signs, Florida now has five Daktronics DMS and one DMS traffic cabinet on its Approved Product List (APL).
  • Malaysia’s massive road building project is advancing the use of technology
    August 10, 2020
    Malaysia’s huge Pan Borneo Highway project is benefiting from the use of some of the latest technologies in its planning, design and construction