Skip to main content

Florida Turnpike improvements underway

A series of improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak
September 18, 2019 Read time: 2 mins
A series of  improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. 2697 Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak periods, improving journey times for drivers.


Elsewhere in the state, FDOT recently opened new lanes for the Beachline Expressway/SR 528 from I-4 to the Turnpike. This section now features two express lanes as well as an auxiliary lane in each direction. The improved section from the Turnpike to McCoy Road is also scheduled to open shortly. The work includes intersection improvements and is costing $170 million, while it is intended to boost capacity and safety, as well as cutting congestion and journey times for drivers.

FDOT is also evaluating the potential for road improvements between US 17/SR 35 and SR 60 in Polk County.

In addition, Florida’s Turnpike Enterprise recently began collecting all-electronic, no cash tolls at the southbound Sawgrass Expressway entrance ramp from Pat Salerno Drive. Tolls are now being collected using an overhead toll gantry system.

For more information on companies in this article

Related Content

  • New road project underway in Austin, Texas
    April 27, 2023
    Construction work is now underway on a new road project in Austin, Texas.
  • $11.5 billion for Arizona transport programme
    July 8, 2025
    Arizona’s transport construction programme will be worth $11.5 billion.
  • Key SR-91 highway upgrade underway in California
    December 16, 2013
    In the US state of California, construction is now underway for the State Route 91 (SR-91) Corridor Improvement Project. This improved section for SR-91 will run through the Corona and Riverside, both of which are located in Riverside County. The project will extend the SR-91 Tolled Express Lanes in Orange County into Riverside County, a distance of 17.6km. This includes a 13km stretch into Riverside County on SR-91, with a 5km flyover connecting to Interstate 15 from SR-91. Riverside County Transportation
  • Parsons wins Florida interchange redesign contract
    February 23, 2017
    The Florida Department of Transportation has awarded Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected. The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-9