Skip to main content

First stage of Chain of Rocks Bridge demolition carried out in US

Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.
January 21, 2015 Read time: 1 min
Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri.  For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Live video stream captures fall of infamous bridge Live video stream captures fall of infamous bridge. false http://www.demolitionnews.com/2015/01/20/video-chain-of-rocks-bridge-downed/ false false%>

Related Content

  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    February 7, 2013
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • Damaged Norwegian bridge undergoes successful demolition
    February 23, 2015
    A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
  • VIDEO: Barcelona wheelchair user weaving in traffic, passes cars
    July 25, 2016
    A wheelchair-bound man in Spain has been caught on camera weaving in and out of Barcelona traffic and moving faster than surrounding vehicles. The street racer was cruising along Barcelona's Carrer de Muntaner when a motorcycle passenger took the video. You Tube videos of speeding wheel chair users are becoming more common. But so too are videos of people who generally want more mobility out their wheelchair. So click here to see a more sensible way to live life in your wheelchair in the fast lane. Appa
  • Matest Asphalt Splitter will make life easier for lab technicians
    January 6, 2017
    Materials testing firm Matest has launched an asphalt splitter at bauma. The machine breaks up asphalt specimens so that the constituent parts can be tested, a task that is often carried out by hand. “The purpose of the machine is to make the operator’s life easier,” said area manager Massiono Martorini. The splitter should also lead to greater efficiency, as breaking specimens down will take less time, and allow laboratory technicians to do other things. Matest expects to sell the splitter to laboratories