Skip to main content

First stage of Chain of Rocks Bridge demolition carried out in US

Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.
January 21, 2015 Read time: 1 min
Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri.  For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Live video stream captures fall of infamous bridge Live video stream captures fall of infamous bridge. false http://www.demolitionnews.com/2015/01/20/video-chain-of-rocks-bridge-downed/ false false%>

Related Content

  • Engcon improves tilt-rotator design
    April 19, 2012
    Engcon has introduced a new range of tilt-rotators, using a cast housing to greatly increase capacity. The EC218 and EC226 replace the EC15 and EC20 respectively. The former is suitable for machines up to 18tonnes in operating weight, while the latter is designed for excavators up to 26 tonnes. The cast housing incorporates internal lubrication channels for centralised greasing, reducing the risk of dust ingress or damage while operating. Larger bushes are used to reduce the chance of play in the housing
  • Losing your car ain’t as hard as you would think
    April 29, 2015
    Thankfully it doesn’t happen too often, but forgetting where you parked your car can be an embarrassing moment, or several days, as one man in the UK recently found. Jason Matthews, 40, ran the Manchester City Marathon on April 19 in five hours and 11 minutes and then spent an additional several hours looking for his Saab 93 Sport. He said he couldn’t recall where he had parked the vehicle. He walked back around some of the 26-mile – nearly 42km - course, before driving around in a taxi for 40 minutes an
  • Sandvik adds to DC hammer drill line
    January 6, 2017
    Sandvik Construction has added the DC125R to its DC family of compact top hammer drill rigs. The remote-controlled self-propelled rig has a four-wheeled carrier that can also be equipped with rubber tracks for added mobility in difficult terrain. Capable of drilling 22-45mm diameter holes, the machine is capable of up to 300-400m3 in an eight-hour shift. The 3,150kg mini rig is powered by a 37kW engine that drives a 5.5kW rock drill. Designed primarily for foundation drilling, road cutting, trenching, line
  • Sandvik adds to DC hammer drill line
    April 16, 2013
    Sandvik Construction has added the DC125R to its DC family of compact top hammer drill rigs. The remote-controlled self-propelled rig has a four-wheeled carrier that can also be equipped with rubber tracks for added mobility in difficult terrain. Capable of drilling 22-45mm diameter holes, the machine is capable of up to 300-400m3 in an eight-hour shift. The 3,150kg mini rig is powered by a 37kW engine that drives a 5.5kW rock drill. Designed primarily for foundation drilling, road cutting, trenching, line