Skip to main content

First stage of Chain of Rocks Bridge demolition carried out in US

Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.
January 21, 2015 Read time: 1 min
Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri.  For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Live video stream captures fall of infamous bridge Live video stream captures fall of infamous bridge. false http://www.demolitionnews.com/2015/01/20/video-chain-of-rocks-bridge-downed/ false false%>

Related Content

  • Anaconda shows off screener and conveyor
    February 26, 2013
    Anaconda Equipment International will have two products on display at its first bauma: the DF410 tracked screener and a TR60 18m track-mounted stockpiling conveyor. The DF410 entry level screener can screen and stockpile up to 250tonnes/hour of material into three sizes, and is said to be ideal for those restricted by working area in urban areas.
  • Less damage for a low cost with SKF’s new development
    January 6, 2017
    More machines, both mobile and stationary, are using centralised lubrication which helps to ensure that all points receive the required amount of lubrication, as lack of it could result in expensive bearing damage. Escaping lubricant can have a significant negative impact on the environment, and can also incur expensive clean-up and disposal costs. SKF has developed the Lincoln Hose Connection Control, which can be operated between -50 to +70 OC, this unit shows immediately and reliably when damage occurs.
  • Less damage for a low cost with SKF’s new development
    February 13, 2013
    More machines, both mobile and stationary, are using centralised lubrication which helps to ensure that all points receive the required amount of lubrication, as lack of it could result in expensive bearing damage. Escaping lubricant can have a significant negative impact on the environment, and can also incur expensive clean-up and disposal costs. SKF has developed the Lincoln Hose Connection Control, which can be operated between -50 to +70 OC, this unit shows immediately and reliably when damage occurs.
  • Sandvik is now using Volvo Penta engines in its underground trucks and loaders
    January 6, 2017
    Sandvik Mining is now using Volvo Penta engines in its underground trucks and loaders. The advanced engines meet Tier 4 Interim/Stage IIIB emission standards and are claimed to reduce fuel and ventilation costs in comparison with other units. The Volvo Penta engineers designed a selective catalytic reduction (SCR) unit in the exhaust system that converts NOx gas into nitrogen and water. The Volvo Penta exhaust-treatment solution also reduces DPM levels without the need for a diesel particulate filter (DPF).