Skip to main content

First stage of Chain of Rocks Bridge demolition carried out in US

Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.
January 21, 2015 Read time: 1 min
Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri.  For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Live video stream captures fall of infamous bridge Live video stream captures fall of infamous bridge. false http://www.demolitionnews.com/2015/01/20/video-chain-of-rocks-bridge-downed/ false false%>

Related Content

  • Turkmenistan starts construction of Ashgabat-Turkmenbashi road
    May 8, 2015
    Turkmenistan has started construction of the 544km Ashgabat-Turkmenbashi highway under a public-private partnership contract. The deal is expected to cost between US$800-900 million for every 2km or so of road construction from Ashgabat in central Turkmenistan to Turkmenbashi, a city of around 90,000 on the eastern coast of the Caspian Sea. For a YouTube video graphic representation of the highway, click here. To see World Highways report onTurkmenistan’s highways projects in 2011, click here. Türkmenb
  • Erlau’s Sideflex tyre protection system deflects rock debris away from tyres
    January 6, 2017
    Identifying the cost and downtime caused by damaged sidewalls on dumptrucks used in mining and quarry applications, Erlau has developed the Sideflex tyre protection system, which is claimed to be capable of deflecting rock debris away from tyre walls. Using bolt-on segments that form an Armadillo-like layer of protection covering the outer sidewall of an earthmoving tyre, Sideflex affords high-speed use, unlike traditional tyre chain protection systems, which offer limited speeds in use. “Comprehensive tyre
  • Erlau’s Sideflex tyre protection system deflects rock debris away from tyres
    April 18, 2013
    Identifying the cost and downtime caused by damaged sidewalls on dumptrucks used in mining and quarry applications, Erlau has developed the Sideflex tyre protection system, which is claimed to be capable of deflecting rock debris away from tyre walls. Using bolt-on segments that form an Armadillo-like layer of protection covering the outer sidewall of an earthmoving tyre, Sideflex affords high-speed use, unlike traditional tyre chain protection systems, which offer limited speeds in use. “Comprehensive tyre
  • Snow removal: a right way and a wrong way
    June 12, 2015
    Snow. That winter menace for road users. Often it catches drivers unaware; often its efficient removal is planned for by road authorities. Some regions and countries get more snow than others, such as Scandinavia, northern Europe and North America, and are better at it.