Skip to main content

First stage of Chain of Rocks Bridge demolition carried out in US

Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.
January 21, 2015 Read time: 1 min
Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri.  For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Live video stream captures fall of infamous bridge Live video stream captures fall of infamous bridge. false http://www.demolitionnews.com/2015/01/20/video-chain-of-rocks-bridge-downed/ false false%>

Related Content

  • Mitas adds to earthmoving tyre range
    April 17, 2013
    Mitas has unveiled the newest addition to its family of ERL earthmoving tyres, the 20.5R25 ERL-50. The tyre will become available for sale worldwide by July. Mitas makes specific tyres for machines operating in demanding conditions, including gravel and rock quarries. The Mitas ERL series features 12 tyres of 28mm to 90mm tread depth, with the ERL-50 designed for rocky conditions.
  • Sleipner’s highlights system for moving excavators
    February 13, 2013
    Sleipner will explain the principle behind its “revolutionary method to improve the overall productivity in open-pit mines, quarries and construction sites.” The improvement is based on moving excavators around the site much faster than before, and additionally the Sleipner method saves time and money and considerably increases the excavators’ life, says the company.
  • High versatility is claimed for Fayat’s new emulsion plant
    February 11, 2013
    From French firm FAYAT comes its new range of EP 10 emulsion plants equipped with the proven, low noise Bitumill emulsifier system. According to the firm, the plant is highly versatile and can be adapted to meet the needs of low or medium output installations. The equipment is mounted inside a standard 12.2m container making it easier to transport while the system has an ergonomic layout that is said to make it easy to use. An innovative closed-circuit hot water production system is said to reduce energy co
  • New machines and a new division for Controls Group
    January 6, 2017
    Controls Group launched the Automax range of testing machines at bauma 2013.