Skip to main content

First stage of Chain of Rocks Bridge demolition carried out in US

Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.
January 21, 2015 Read time: 1 min
Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri.  For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Live video stream captures fall of infamous bridge Live video stream captures fall of infamous bridge. false http://www.demolitionnews.com/2015/01/20/video-chain-of-rocks-bridge-downed/ false false%>

Related Content

  • Getech spins centrifugal washwater cleaner into tunnelling applications
    April 17, 2013
    Getech, the Italian manufacturer of centrifugal washwater cleaning systems (formerly Gennaretti) is targeting tunnelling operations with containerised versions of its V type machines. The five-machine range can remove up to 60tonnes an hour of solids from washwater flows of up to 180m3/hr.
  • Premiere for SBM’s REMAX 1112 MAXI mineral processor
    February 13, 2013
    Austrian company SBM Mineral Processing, a member of the MFL Group, is showing for the first time its new mobile mineral processing plant. Expanding its REMAX series with the 41tonne mobile track-mounted REMAX 1112 MAXI plant, it is said to offer a completely redesigned material flow making material jamming “a thing of the past.” The company says the discharge conveyor belt below the screen can be optionally fixed or swivelled by 180° increasing stockpile capacity five-fold and considerably improving logist
  • ZF chooses radial motor technology for its hydrostatic transmission
    January 6, 2017
    ZF has chosen a pair of radial hydraulic motors for use in its compact single-speed hydrostatic transmission, the 2HC85, which has been developed for compact wheeled loaders up to 100kW and 10.5tonnes operating weight. For high-torque start-up, the transmission sends oil to both motors and demands maximum stroke to travel from 0-16kph, before isolating one motor and then using 100% oil flow through the remaining motor to propel the machine to its maximum travel speed of 42kph. ZF said radial motors afford a
  • ZF chooses radial motor technology for its hydrostatic transmission
    April 18, 2013
    ZF has chosen a pair of radial hydraulic motors for use in its compact single-speed hydrostatic transmission, the 2HC85, which has been developed for compact wheeled loaders up to 100kW and 10.5tonnes operating weight. For high-torque start-up, the transmission sends oil to both motors and demands maximum stroke to travel from 0-16kph, before isolating one motor and then using 100% oil flow through the remaining motor to propel the machine to its maximum travel speed of 42kph. ZF said radial motors afford a