Skip to main content

First stage of Chain of Rocks Bridge demolition carried out in US

Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.
January 21, 2015 Read time: 1 min
Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri.  For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Live video stream captures fall of infamous bridge Live video stream captures fall of infamous bridge. false http://www.demolitionnews.com/2015/01/20/video-chain-of-rocks-bridge-downed/ false false%>

Related Content

  • New emission compliant dozers are offered by Dressta
    January 6, 2017
    Dressta is now offering versions of its well-proven bulldozer range equipped with Tier 4 Interim/Stage IIIB emission compliant engines. The TD-25, TD-20, TD-15 and TD-14 class dozers will all be available with Tier 4 Interim/Stage IIIB emission rated diesels during 2013. The company says that its TD-10, TD-9, TD-8 and TD-7 bulldozers will be available with Tier 4 Interim/Stage IIIB engines in 2014, while these models will also be revamped with new hydrostatic drivelines. The TD-40 and TD-25 will remain avai
  • New emission compliant dozers are offered by Dressta
    February 7, 2013
    Dressta is now offering versions of its well-proven bulldozer range equipped with Tier 4 Interim/Stage IIIB emission compliant engines. The TD-25, TD-20, TD-15 and TD-14 class dozers will all be available with Tier 4 Interim/Stage IIIB emission rated diesels during 2013. The company says that its TD-10, TD-9, TD-8 and TD-7 bulldozers will be available with Tier 4 Interim/Stage IIIB engines in 2014, while these models will also be revamped with new hydrostatic drivelines. The TD-40 and TD-25 will remain avai
  • New cone crusher from Telsmith
    April 19, 2013
    Telsmith, a member of the Astec group of companies, has launched the new Telsmith 300 cone crusher. The Telsmith 300 has a number of key features such as hydraulic overload protection, chamber clearing, push-button adjustment, and Telsmith’s exclusive anti-spin system. The cone crusher features the Telsmith Trac10 series automated control system, which provides automated calibration and setting control, protecting the crusher from overload and enhancing performance and efficiency. Trac10 continuously monito
  • More efficient ground stabilisation with the Allu 3D Positioning System
    January 6, 2017
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in