Skip to main content

First span of Governor Mario M. Cuomo Bridge in New York opens

The first span of the 5km twin-span Governor Mario M. Cuomo Bridge - formerly the Tappan Zee Bridge - in New York opened August 25. Tappan Zee Constructors, joint venture led by Fluor and including American Bridge, Granite and Taylor Bros., shift all four lanes of westbound traffic from the existing bridge to the new span overnight. The four eastbound lanes will be shifted onto the new span in the autumn. Demolition of the old bridge can then get underway, allowing more room for construction of the adjacent
August 25, 2017 Read time: 2 mins
One down, one to go for the Governor Mario M. Cuomo Bridge - formerly the Tappan Zee Bridge

The first span of the 5km twin-span Governor Mario M. Cuomo Bridge - formerly the Tappan Zee Bridge - in New York opened August 25.

Tappan Zee Constructors, joint venture led by Fluor and including American Bridge, Granite and Taylor Bros., shift all four lanes of westbound traffic from the existing bridge to the new span overnight.

The four eastbound lanes will be shifted onto the new span in the autumn. Demolition of the old bridge can then get underway, allowing more room for construction of the adjacent second new span, said Hans Dekker, president of Fluor’s infrastructure business.

“We are proud of the Fluor-led joint venture team for advancing this landmark megaproject and look forward to building on this milestone to complete the second span next year,” said Dekker.  

The client, New York State Thruway Authority, started building the cable-stayed bridge across the Hudson River between Westchester and Rockland counties in late 2013. When finished next year, it will be the largest bridge in New York State history.

The cable-stayed main span is supported by eight 128m towers, which stand at 5° angles and feature a sleek, chamfered design. The iconic towers support 192 stay cables, which are made up of nearly 7,900km of steel strands.

In final configuration, the Governor Mario M. Cuomo Bridge will carry eight general traffic lanes - four each on the westbound and eastbound spans - breakdown/emergency lanes, space for future bus rapid transit and commuter rail and an advanced traffic monitoring system.

Related Content

  • Pearl Harbor Memorial Bridge, an extradosed design, opens in Connecticut
    September 30, 2015
    The first extradosed designed bridge in the United States, the Pearl Harbor Memorial Bridge in New Haven, Connecticut, was opened to traffic on September 28.
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • Fluor wins award from Highways England
    November 5, 2015
    Fluor Corporation has won an achievement award from Highways England for its National Roads Telecommunications Services (NRTS) project. This has been recognised by Highways England for achieving 3 million safe working hours while executing the project across England’s operational motorways and trunk roads. The Significant Achievement Award for Safety was presented by David Brewer, Highways England’s network delivery and development executive director to Kevin Hamer, Highways England NRTS contract manage
  • Talks continue for 2025 Gordie Howe opening
    January 18, 2023
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.