Skip to main content

First section of new Texas route opening

The first stretch of a highway development project in Texas is now open. New southbound toll lanes have been built for the Texas 288 project, running between downtown Houston and the Brazoria County line. The existing southbound traffic is being shifted to these lanes on a temporary basis between Holly Hall and Loop 610. But drivers are not being tolled at present. The US$815 million work is due for completion in 2019, when the tolling system will come into full use. The project involves widening the route
November 21, 2017 Read time: 1 min

The first stretch of a highway development project in Texas is now open. New southbound toll lanes have been built for the Texas 288 project, running between downtown Houston and the Brazoria County line. The existing southbound traffic is being shifted to these lanes on a temporary basis between Holly Hall and Loop 610. But drivers are not being tolled at present. The US$815 million work is due for completion in 2019, when the tolling system will come into full use. The project involves widening the route with the addition of two tolled lanes in either direction between Interstate 69 to Brazoria County, with work having commenced in October 2016. A consortium called Blueridge Transportation Group is carrying out the construction work, which is intended to cut congestion. The consortium will also maintain the route until 2065 as part of its package arranged with TxDOT.

Related Content

  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.
  • Two major Indian highway links under construction
    July 21, 2022
    Two major Indian highway links are under construction.
  • Funding secured for Nepal highway connection
    October 11, 2018
    A funding package has been secured that will help pay for a key road project in Nepal. The Asian Development Bank (ADB) is providing a loan worth US$180 million that will be used to help pay for widening work to an 87km stretch of the East-West Highway between Kamala and Kanchanpur. At present the route has just one lane in either direction but the upgrade will see the route being widened in a bid to boost capacity and safety, with two lanes in either direction. The project is being managed by the Nepalese
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many