Skip to main content

First deck span completed for Mersey Gateway's north approach viaduct

The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.
February 12, 2016 Read time: 2 mins

The 6126 Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed.

The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.

The MSS, which acts as a giant concrete mould, was specially designed for the Mersey Gateway Project. It is being used to build the two elevated approach viaducts over the Mersey estuary.

The span connects the beginning of the approach viaduct from the north abutment in Widnes to the first supporting pier. It measures around 60m long and 18m wide and is angled at 5 degrees to allow vehicles to travel safely around the curve of the approach road.

Construction teams worked around the clock to get the span ready. This involved pouring 1,146m3 of concrete into the MSS non-stop over 34 hours.


"This is a real achievement for the project and a milestone that we've been looking forward to with anticipation,” said Declan Cannar, Merseylink's general foreman in charge of the MSS operation. “We're now busy preparing the MSS so it's ready to cast the next section."

The approach viaduct deck is being constructed in three phases. The deck spans are constructed first by the MSS, then a deck slab is built on top of the span, and finally the outer deck or ‘wings' are built by a wing traveller machine to provide the full six lane width of the approach road.

The MSS has moved to its second casting position ready for work to begin on the next span, which will be cast in March.

View Trinity in action by clicking here.
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.merseygateway.co.uk/live-view Visit www.merseygateway.co.uk/live-view false http://www.merseygateway.co.uk/live-view false false%>

For more information on companies in this article

Related Content

  • Key event for asphalt industry in Europe
    July 16, 2019
    A key event is being planned for Europe’s asphalt industry. The European Asphalt Pavement Association (EAPA) will hold the 1st EAPA Workshop on the Use of Rejuvenators in Asphalt Mixtures on the 10th and 11th September 2019. The workshop will be held in the Italian city of Padova at the Caffe Padrocchi (Rossini room) - Via VIII febbraio, n. 15 - 35122 Padova. It will take place in the afternoon of 10th September 2019 and the morning of 11th September, followed by the 5th International ISAP Symposium on A
  • UK’s M3 motorway gets first orange emergency area
    August 1, 2017
    The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
  • Dubuis’s cutting-edge crimping
    January 6, 2017
    France-based Dubuis is unveiling its new Neoelec in line BPL36 crimping tool at Intermat 2012.The company, bought by Stanley Black&Decker in 2006, has designed a crimper with 35kN force and 8mm stroke, weighing 2.1kg and capable of 4-185mm² hexagonal crimping.
  • Dubuis’s cutting-edge crimping
    February 6, 2012
    France-based Dubuis is unveiling its new Neoelec in line BPL36 crimping tool at Intermat 2012.The company, bought by Stanley Black&Decker in 2006, has designed a crimper with 35kN force and 8mm stroke, weighing 2.1kg and capable of 4-185mm² hexagonal crimping.